A kind of production method of 5182 aluminum alloy pull ring material base material

A production method and technology of aluminum alloy, which is applied in the field of aluminum alloy manufacturing, can solve the problems of increasing the risk of surface quality defects of bruise defects, reducing the finished product rate of pull ring materials, and increasing the number of machines, so as to shorten production operation time and reduce The probability of being bruised and the effect of improving yield

Active Publication Date: 2018-04-17
SHANDONG NANSHAN ALUMINUM +3
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The aluminum alloy is cold-rolled in five passes, which not only takes a long time and reduces work efficiency, but also increases the number of machines, which also increases the probability of bruising defects and the risk of surface quality defects ; At the same time, due to the repeated removal of the head and tail materials in the cold rolling process, material waste is caused, which reduces the yield of the pull ring material

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of production method of 5182 aluminum alloy pull ring material base material
  • A kind of production method of 5182 aluminum alloy pull ring material base material
  • A kind of production method of 5182 aluminum alloy pull ring material base material

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] The alloy state of the 5182 aluminum alloy pull ring material base material described in this example: 5182 / H19, the thickness of the finished product: 0.267mm, and its production process includes: melting and casting → sawing → milling → soaking → (1+4) thermal connection Rolling → three-stand cold rolling once → cleaning and trimming → three-stand cold rolling once → tension bending straightening → finished product shearing.

[0026] 1) Casting: Chemical composition of aluminum water after casting: Si: 0.1181%, Fe: 0.2328%, Cu: 0.0546%, Mn: 0.3593%, Mg: 4.6379%, Cr: 0.0256%, Zn: 0.0309%, other single impurities ≤ 0.03%, total ≤0.15%, the rest is Al, melting temperature: 755-760°C, refining temperature: 776-780°C, casting temperature: 708-710°C.

[0027] 2) Soaking: ingot temperature 490°C, holding time: 2 hours.

[0028] 3) (1+4) continuous hot rolling: use 1+4 continuous hot rolling, 21 rough rolling passes, and then roll through a 4-stand continuous rolling mill. T...

Embodiment 2

[0051] The alloy state of the 5182 aluminum alloy pull ring material base material described in this example: 5182 / H19, the thickness of the finished product: 0.38mm, and its production process includes: melting and casting → sawing → milling → soaking → (1+4) thermal connection Rolling → three-stand cold continuous rolling once → cleaning and trimming → one pass for a single stand → two passes for a single stand → tension bending straightening → finished product shearing.

[0052] 1) Casting: Chemical composition of aluminum water after casting: Si: 0.0941%, Fe: 0.2539%, Cu: 0.0507%, Mn: 0.3591%, Mg: 4.6225%, Cr: 0.0287%, Zn: 0.027%, other single impurities ≤ 0.03%, total ≤0.15%, the rest is Al, melting temperature: 734-741°C, refining temperature: 741-746°C, casting temperature: 693-695°C.

[0053] 2) Soaking: ingot temperature 470°C, holding time: 3 hours.

[0054] 3) (1+4) continuous hot rolling: use 1+4 continuous hot rolling, 21 rough rolling passes, and then roll throu...

Embodiment 3

[0062] The alloy state of the 5182 aluminum alloy pull ring material base material described in this example: 5182 / H19, the thickness of the finished product: 0.46mm, and its production process includes: melting and casting → sawing → milling → soaking → (1+4) thermal connection Rolling → three-stand cold continuous rolling once → cleaning and trimming → one pass for a single stand → two passes for a single stand → tension bending straightening → finished product shearing.

[0063] 1) Casting: Chemical composition of aluminum water after casting: Si: 0.1064%, Fe: 0.2439%, Cu: 0.0628%, Mn: 0.2015%, Mg: 4.6920%, Cr: 0.0306%, Zn: 0.026%, other single impurities ≤ 0.03%, total ≤0.15%, the rest is Al, melting temperature: 720-726°C, refining temperature: 740-745°C, casting temperature: 690-693°C.

[0064] 2) Soaking: ingot temperature 480°C, holding time: 3 hours.

[0065] 3) (1+4) continuous hot rolling: use 1+4 continuous hot rolling, rough rolling for 25 passes, and then roll t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
thicknessaaaaaaaaaa
thicknessaaaaaaaaaa
widthaaaaaaaaaa
Login to View More

Abstract

The invention discloses a production method for a 5182 aluminum alloy tab stock base material. The production method includes the production processes of fusion casting, saw cutting, surface milling, soaking, (1+4) hot continuous rolling, cold continuous rolling with three machine frames, cleaning and trimming, and cold continuous rolling with one machine frame. According to the production method, the effect that the mechanical properties of the 5182 aluminum alloy tab stock base material are stable and qualified is guaranteed, the production processes are shortened, and the production efficiency is improved.

Description

technical field [0001] The invention relates to the field of aluminum alloy manufacturing, in particular to a production method of a 5182 aluminum alloy pull ring material base material. Background technique [0002] The 5052 and 5182 alloys are used for pull ring materials. The 5052 alloy has a low magnesium content and is an early alloy. The 5182 alloy is an alloy with a high magnesium content. The pull ring products produced by the 5182 alloy have performance stability and use Wider range. In the production of pull ring materials, it is the goal of the cover industry to minimize the thickness of the sheet metal, improve the elongation and strength of the product, improve the utilization rate of the material, and reduce the production cost. At present, the thickness of tab material is 0.267mm, 0.279mm, 0.29mm, 0.305mm, 0.36mm, 0.38mm, 0.405mm, 0.457mm, 0.46mm. The mechanical properties put forward higher requirements; at the same time, with the continuous development of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): C22C1/02C22C21/08C22F1/047
CPCC22C1/026C22C21/08C22F1/047
Inventor 程仁策吕正风隋信栋顾华锋曲大保杨立民赵晓红喻翠平徐虎厚李涛郭宝丰刘清雨李志中史春丽张启东祝贞凤李辉潘荣凯
Owner SHANDONG NANSHAN ALUMINUM
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products