Path calculation processing method and path calculation processing device
A processing method and processing device technology, applied in the field of communication, can solve problems such as inconsistencies in constraint methods, and achieve the effect of improving user experience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] This preferred embodiment 1 provides a method for notifying tunnel Metric path calculation constraints, Figure 8 is a flow chart of the method for notifying tunnel Metric path calculation constraints according to a preferred embodiment of the present invention, such as Figure 8 As shown, the method includes the following steps:
[0063] Step 802, when the head node determines the metric path calculation policy of a certain tunnel, it needs to write the policy information into the PATH message of RSVP-TE.
[0064] Specifically, the written information may be a newly added object, or may be a reserved bit or an unoccupied bit of an existing object; for example, an unused BIT bit in FLAG in the SESSION_ATTRIBUTE object may be used.
[0065] Step S804, sending the PATH message carrying the Metirc constraint information to each downstream node.
Embodiment 2
[0067] The second preferred embodiment provides a method for calculating the path of a tunnel intermediate node, Figure 9 is a flow chart of the method for calculating the path of a tunnel intermediate node according to a preferred embodiment of the present invention, such as Figure 9 As shown, the method includes the following steps:
[0068] In step S902, the intermediate node receives the upstream PATH message, and analyzes the upstream Metirc constraint route calculation mode information.
[0069] Specifically, the object carried by the upstream determines the resolution content, which can be a newly added object, or a reserved bit or an unoccupied bit of an existing object. The FLAG field of the SESSION_ATTRIBUTE object used by the present invention receives the PATH message and parses the content of the field FLAG is eighth.
[0070] In step S904, according to the route calculation method of the analyzed Metric constraint, it is judged whether the node needs to calcu...
example 1
[0074] like figure 2 As shown, the tunnel with R1 as the head node and R3 as the tail node. Since the head node and the tail node are located in different domains, when R1 calculates the route, it can only calculate the route to the boundary of the domain, R2 or R4, assuming that the route is calculated to R2, the tunnel metric constraint calculation method of the head node is the TEMetric method .
[0075] Then, the optimal path from R1 to R2 is R1→R4→R2. After the path calculation is completed, the PATH message sent to R4 is set to 1 in the Flag field 0x80 in SESSION_ATTRIBUTE, indicating that the path calculation method is the TEMetric constraint path calculation method. .
[0076] R4 receives the PATH message, because the path has been calculated to R2, so there is no need to calculate the path again, and R4 passes the PATH message carrying the TEMetric constraint path calculation mode information to R2.
[0077] After receiving the PATH packet, R2 needs to calculate t...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com