Method for stopping water of clearance between wall board and base plate of bearing plate steel suspension box
A steel hanging box and bottom plate technology, which is applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of large concrete volume, high cost, water leakage, etc., and achieve the effect of strong crack resistance, low cost, and simple operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be described in further detail below in conjunction with the accompanying drawings and cases, and these cases are only used to illustrate the present invention and not limit its scope.
[0013] Such as figure 1 As shown, the method for sealing the gap between the wall plate and the bottom plate of the steel hanging box of the cap platform, the specific implementation method is: firstly clean up the debris in the gap between the wall plate and the bottom plate of the steel hanging box, and sprinkle water to moisten it; then mix the cement mortar with the Plugging Wang waterproof glue is mixed in a ratio of 10:1 and stirred evenly;
[0014] In a dry water environment, slowly pour into the gap between the steel hanging box wall plate and the steel hanging box precast concrete floor until the pouring surface is at the same level as the precast concrete slab surface;
[0015] After 72 hours of pouring, and when the concrete strength is greater tha...