Check patentability & draft patents in minutes with Patsnap Eureka AI!

Integral lifting and installation construction method for prefabricated temporary steel pipe brackets

A steel pipe support and overall hoisting technology, which is applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of many hidden dangers in high-altitude operation, many input resources and facilities, and large amount of welding works, so as to reduce the risk of high-altitude operation, The effect of improving construction work efficiency and welding quality

Active Publication Date: 2016-10-26
中交中南工程局有限公司
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] When the on-site assembly method is used for construction, it conflicts with the construction of the bridge cap and pier body structure. It is necessary to complete the main construction tasks of the substructure before the bracket assembly operation, which is a flow operation; at the same time, the height of the general bracket erection is more than 10m. For high-altitude operations, the amount of welding work for on-site assembly is relatively large. When welding, the welding process is mostly vertical welds. Compared with horizontal welding, the welding progress is slow, the quality is poor, more resources and facilities are invested, and the construction cost is higher. , and there are many safety hazards in high-altitude operations, and management is difficult

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral lifting and installation construction method for prefabricated temporary steel pipe brackets

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The present invention will be further described below in conjunction with specific embodiments.

[0024] Such as figure 1 As shown, the overall hoisting construction method of the prefabricated steel pipe support shown in the present invention includes: steel pipe support design, support prefabricated site leveling, hardening, drawing steel pipes, flat joints, scissors braces, upper and lower steel plates and other semi-finished structures. Processing, horizontal scissor brace welding connection, erecting steel pipe support prefabricated tire frame, steel pipe column positioning welding, steel pipe support assembly, steel pipe support installation foundation construction, prefabricated steel pipe support one-time hoisting in place, pile top beam installation, according to the target structure The leveling device on the top of the beam is installed at the level of the bottom plate.

[0025] Specifically, the design of the steel pipe support is designed according to the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an integral lifting and installation construction method for prefabricated temporary steel pipe brackets. The integral lifting and installation construction method comprises the steps that a bracket prefabricated jig frame is erected according to the requirements of the installation structure and integral lifting, a semi-finished product structure detail drawing is drawn according to a design drawing, and blanking is prepared at the same time; horizontal bracings and cross bridgings are integrally welded and connected, and steel pipe vertical column positioning and welding start to be conducted on the steel pipe bracket prefabricated jig frame at the same time; the horizontal bracing cross bridging welded pieces are welded to steel pipe vertical columns, and steel pipe bracket assembling construction is started; the super-long steel pipe brackets are processed by adopting a matching method, so that the site bracket installation precision requirement is met; the prefabricated steel pipe brackets are transported to the installation site through transportation equipment and are lifted to be in place at a time through lifting equipment; and steel pipes are adjusted according to the elevations of target structure bottom plates, so that structure pre-arches and cross slopes meet the installation requirements. According to the integral lifting and installation construction method for the prefabricated temporary steel pipe brackets, the construction progress is speeded up; the high-altitude operation risk is reduced; the assembling difficulty of the assemblies is lowered; the installation precision is improved; and the influence of high-altitude factors on the welding quality is overcome.

Description

technical field [0001] The invention relates to a prefabricated temporary steel pipe support in the back field and a temporary support installation method for overall hoisting in place on site, and belongs to the technical field of steel pipe support prefabrication. Background technique [0002] With the rapid development of the domestic economy, the pace of construction of domestic expressways and urban road networks has increased year by year, and the scale of bridge construction has reached the international leading level in the world. There are many types of temporary supports used in bridge construction, such as bowl buckle supports, pan buckle supports, portal supports and steel pipe supports. In the construction of traffic facilities in mountainous areas with narrow space, large terrain fluctuations, and inconvenient transportation, steel pipe-shaped steel brackets are used for temporary piers relatively frequently. At present, domestic temporary steel pipe brackets a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 余昌平钱光勇
Owner 中交中南工程局有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More