Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

169results about How to "Reduce resource input" patented technology

Advertisement playing system and method based on image identification

The invention discloses an advertisement playing system and an advertisement playing method based on image identification. The system comprises an advertisement display platform, an image acquisition system and a data analysis processing module. The implementation method comprises the following steps of: acquiring an attention degree of an advertisement audience to an advertisement in real time by the image acquisition system added into the advertisement display platform, automatically analyzing feedback of the advertisement audience to the advertisement according to human face expression identification, automatically analyzing and pre-estimating an age structure and genders of client groups according to human body feature analysis and identification, and supplying reference to subsequent playing of the advertisement. By the system and the method, advertisement audience data can be timely acquired and quickly transmitted to an advertisement supplier and an advertising product supplier, so that an advertisement effect and an advertisement investment value can be accurately analyzed, and relevant staff can timely adjust an advertisement strategy; and a relatively high push effect is achieved for popularization of products.
Owner:鼎亿数码科技(上海)有限公司 +1

Processing system of concrete combined aggregate and construction method

The invention provides a concrete combined aggregate processing system, which comprises a first receiver bin. A first bar type feeder is disposed below the first receiver bin, the undersize part of the first bar type feeder is connected to a rejected material storage yard through a first adhesive tape machine, and the oversize part of the first bar type feeder is connected to a first jaw crusher. The discharge port of the first jaw crusher is connected to an artificial break stone storage yard through a second adhesive tape machine. A second bar type feeder is disposed below a second receiver bin. The oversize part of the second bar type feeder is connected to a second jaw crusher, and the undersize part of the second bar type feeder as well as the discharge port of the second jaw crusher is connected to a natural gravel storage yard through a third adhesive tape machine. The system provided in the invention can adopt two material sources at the same time to conduct production and processing, and the processed combined aggregate can satisfy the quality requirements of concrete aggregates, so that the work efficiency of the aggregate processing system can be enhanced. Moreover, the system is in favor of the sufficient use of project excavation ballast materials so as to reduce resource investment and project investment, and is also beneficial to environmental protection.
Owner:CHINA GEZHOUBA GROUP NO 5 ENG

Vehicle fee charging method and apparatus

The invention relates to a vehicle fee charging method and apparatus. The method comprises the following steps: receiving a fee charging request at an entrance including the vehicle identity information and the fee charging entrance information; transmitting the vehicle identity information at the entrance to a third party application server so that the third party application server is capable of determining whether the vehicle corresponding to the vehicle identity information at the entrance has a third party application bonded account or not and returning the determination result at the entrance; if the determination result at the entrance tells that the vehicle has the third party application bonded account, then sending the pass instruction to the toll gate at the entrance so as to open the gate for the vehicle to enter; and receiving a fee charging request at an exit including the vehicle identity information and the fee charging exit information. In the method and apparatus, according to the vehicle identity information at the entrance, the vehicle identity information at the exist, the toll gate entrance information and the toll gate exit information, the fees that the vehicle is supposed to pay are calculated; and if the vehicle has a third party application bonded account, a pass instruction is sent to the toll gate at the entrance so as to open the gate for the vehicle to enter and the fee subtraction request is sent to the third party application account so as to subtract the fees that the vehicle is supposed to pay. Therefore, the vehicle passing efficiency is increased.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Quick boarding business system with RF-SIM card mobile phone

A quick boarding business system with an RF-SIM card mobile phone comprises: an RF-SIM card on a mobile phone, a quick boarding business system application program written on the RF-SIM card, a quickboarding business service platform, an RF-SIM card reading-printing terminal all-in-one machine and an RF-SIM card reader. A passenger already buying an air ticket can access the quick boarding business service platform through the mobile phone provided with the RF-SIM card to handle check-in business; subsequently, the information of an electronic boarding check is sent to and stored in the RF-SIM card; the passenger can select to swipe the mobile phone on the RF-SIM card reading-printing terminal all-in-one machine in a lobby of an airport and print a paper boarding check, and finally boardthrough security check; or the passenger can directly swipe the mobile phone on an RF-SIM card reader arranged at a security checkpoint and a boarding gate and board through security check. The systemcan reduce the waiting time for passengers to handle boarding business and save precious traveling time, and as regard to airlines, the system can improve the efficiency for passengers to handle boarding procedures, reduce the investment in check-in counter and staff for airlines agents in airports, lower running cost and offer more superior service for passengers.
Owner:北京民航中天科技有限责任公司

An intelligent electric meter state evaluation method based on neural network health degree evaluation

The invention provides an intelligent electric meter state evaluation method based on neural network health degree evaluation, which is a method for establishing and applying a model based on a neuralnetwork, and comprises the steps of A1 a model initial data acquisition method of acquiring network-accessed intelligent electric meter operation related data as initial input data of a neural network model through a power grid marketing business system; A2 screening model input data; A3 model parameter optimization of determining each parameter of the neural network model, and performing parameter training on the neural network model to establish an evaluation model based on the neural network, wherein the evaluation model comprises an electric meter index evaluation model and an electric meter state comprehensive evaluation model; A4 in the application of the state evaluation structure, according to the evaluation result of the evaluation model and the operation cycle of the electric meter participating in evaluation, analyzing the internal relation between the evaluation model and the operation cycle, and predicting the operation sampling inspection time and replacing selection parameters of the electric meter. According to the invention, the electric meter big data accumulated in power grid operation can be utilized to evaluate the on-grid electric meter.
Owner:STATE GRID FUJIAN ELECTRIC POWER CO LTD +1

An obstetrical special disease associated index mining method based on an electronic health record

The invention relates to an obstetrical special disease association index mining method based on an electronic health record. The method comprises the steps of constructing a basic information database, performing disease classification data association, performing data preprocessing, performing sampling to obtain a sample set, constructing a sub-feature screener, constructing a combined screenerand performing association index inspection. The method has the advantages that on the basis of mass electronic health record data, association index mining is carried out, and resource input is low;2, by means of a machine learning method, high-dimensional indexes are automatically analyzed, and a more comprehensive associated index set can be quickly mined; 3, a process-based association indexmining system can be established for the obstetrical special diseases, and the system is easy to popularize in different medical institutions. Therefore, the method provided by the invention is a powerful supplement of a traditional method, on one hand, researchers can be assisted in knowledge discovery, and time and manpower are saved, and on the other hand, a basis can be provided for early prevention and treatment of obstetrical diseases.
Owner:WONDERS INFORMATION

Special functional base material for nutrient-solution-free soilless seedling cultivation of cucumbers and preparation method of special functional base material

The invention relates to a preparation method of a special functional base material for nutrient-solution-free soilless seedling cultivation of cucumbers. The special functional base material can be used for effectively simplifying water and fertilizer management of the soilless seedling cultivation of the cucumbers, and improving the compound type of seedling quality, and a multifunctional nutrient-solution-free soilless seedling cultivation base material formula is obtained. Mushroom dregs are used for partially replacing turf to prepare a soilless seedling cultivation optimized formula base material of the cucumbers; the special functional base material for the nutrient-solution-free soilless seedling cultivation is formed by adding functional substances including a controlled-release fertilizer, a chemical fertilizer, chitosan and the like according to the nutrient content of the base material and the nutrient requirements in a seedling period of the cucumbers; the fertilizer supplying performance of the base material is improved and the nutrient solution management is not carried out in the whole process; the growth of seedlings is promoted and the resilience capability is enhanced. Compared with a current usually-used turf-vermiculite soilless seedling cultivation base material formula, the preparation method has the advantages of reducing the investment of resources, simplifying the seedling cultivation management, cultivating high-quality strong seedlings and the like, and has the environment-friendly and pollution-free effects.
Owner:SHANDONG AGRICULTURAL UNIVERSITY

Superimposed assembly type construction comprehensive pipe rack and construction method thereof

The invention discloses a superimposed assembly type construction comprehensive pipe rack and a construction method thereof. The comprehensive pipe rack is formed by combining a plurality of superimposed assembling plates, wherein the superimposed assembling plates are prefabricated superimposed assembling plates. The superimposed assembling plates each adopt hollow structure design with block-superimposed. Connecting joints of horizontal members and vertical members and connecting joints between the horizontal members all adopt reserved steel bar superimposed cast-in-place connection. Concrete is poured to connect the hollow structures between the superimposed assembling plates to form the comprehensive pipe rack with an integral structure. The superimposed assembling plates is temporarily fixed by using double diagonal bracing connection, and after longitudinal stagnant water steel plates and circumferential stagnant water steel plates are installed and joint steel bars are bound, self-compacting concrete is poured to the hollow structure part. The superimposed assembly type construction comprehensive pipe rack can effectively increase the working surface, creates flow process conditions, speeds up the construction progress, reduces the resource input such as on-site support erection, conforms to green construction, can effectively reduces the cost, and improves the waterproof performance of the structure.
Owner:中铁二十二局集团第三工程有限公司

Weak surrounding rock tunnel excavation construction technology

The invention relates to a weak surrounding rock tunnel excavation construction technology which is mainly used for solving the problems that in existing tunnel excavation, large disturbance is generated to surrounding rock, and destruction is caused to primary support. The technology is implemented according to the following steps that contour line point positions are released on a steel frame close to a tunnel face; insertion grooves are welded to the two sides of an excavator bucket, steel plates are inserted into the insertion grooves by serving as blades, the soft side of the surrounding rock is excavated firstly, the blade on the soft side of the surrounding rock is installed, the tunnel face is excavated with the blade, the blade on the other side is installed, and the side of the tunnel face is excavated; when a loading machine loads waste on the tunnel face, excavation operation is conducted on the other side of the tunnel face through the blade; when excavation of the two sides is completed, the middle of the tunnel face is excavated, and an excavator conducts excavation operation on the left side or right side of the middle of the tunnel face; the top contour line is trimmed through the bucket, and a left footing and a right footing are trimmed through bucket teeth of the excavator; primary support is conducted, and closed looping is conducted on the surrounding rock; next-cycle excavation construction is conducted. The technology has the advantages that small disturbance is generated to the surrounding rock, and the primary support cannot be destructed.
Owner:CHINA RAILWAY 19TH BUREAU GRP 1ST ENG

Method and device for processing vehicle recognition abnormality in parking lot

InactiveCN108898841ASolve the problem that the parking fee cannot be calculatedReduce resource inputTicket-issuing apparatusRoad vehicles traffic controlEngineeringTime difference
The invention discloses a method and device for processing vehicle recognition abnormality in a parking lot. The method comprises: when a departing vehicle is detected, a license plate number of the departing vehicle is identified to realize matching with a license plate number of an entering vehicle; when the license plate number of the departing vehicle is not identified successfully or the license plate number of the departing vehicle is identified does not match the license plate number of the entering vehicle successfully, vehicle characteristic information of the departing vehicle as well as departing time of the departing vehicle is obtained; the vehicle characteristic information of the departing vehicle matches a pre-stored vehicle entrance photo to obtain entrance time corresponding to the departing vehicle, wherein the vehicle entrance photo is shot when the vehicle enters the parking lot; and according to a time difference between the departing time of the departing vehicleand the entrance time corresponding to the departing vehicle, a parking fee is calculated. Therefore, a problem that the parking fee can not be calculated because the vehicle can not be identified successfully is solved quickly; and the operation efficiency of the parking lot is improved.
Owner:GUANGZHOU QUNAN ELECTRONICS TECH CO LTD

System and method for detecting and evaluating running state of intelligent electric energy meter

The invention provides a system and method for detecting and evaluating the running state of an intelligent electric energy meter, wherein the method comprises the steps: S1, obtaining a plurality of error state data of the intelligent electric energy meter, and recording the data as the historical data of the intelligent electric energy meter; S2, performing quantization processing and normalization processing on the multiple pieces of error state data in sequence; S3, performing normalization evaluation weighting on the normalized data, performing state evaluation according to a preset threshold value, and recording an evaluation result as performance degradation data; S4, performing data preprocessing on the performance degradation data and the historical data of the intelligent electric energy meter to obtain training data; S5, establishing a detection and evaluation model, and performing model training by using the training data to obtain an optimal detection and evaluation model; and S6, substituting the error state data of the to-be-detected intelligent electric energy meter into the optimal detection and evaluation model, and thus obtaining an operation state detection and evaluation result of the to-be-detected intelligent electric energy meter. According to the method, the running state and performance degradation failure prediction of the intelligent electric energy meter can be scientifically evaluated.
Owner:QUJING POWER SUPPLY BUREAU YUNNAN POWER GRID CO LTD

Method for repairing trenchless coating lining of large-diameter drainage pipeline

The invention discloses a method for repairing a trenchless coating lining of a large-diameter drainage pipeline. The method comprises the steps of pre-construction preparation, repairing constructionand construction quality detection. The method specifically comprises the steps of construction preparation, ventilation detection, pipeline plugging, construction guide and drainage, pipeline dredging, repair point interpretation, in-pipe grouting, interface crack treatment, interface surface treatment, coating repairing construction, edge sealing maintenance, quality inspection and site cleaning. According to the method, a two-component composite waterproof film coating material is formed by a high-molecular polymer emulsion and inorganic powder, so that a high-strength tough waterproof film is formed, and the double advantages of high elasticity of an organic material and good durability of an inorganic material are achieved; a fiberglass mesh layer is additionally arranged, so that the overall tensile strength of the waterproof film can be greatly improved; and a three-base-layer construction process is adopted and comprises bottom layer construction, mesh laying and surface layerconstruction, and the three-base-layer construction process has the advantages that a repaired base layer is firm, and covering and combining are stable.
Owner:中国水利水电第七工程局成都水电建设工程有限公司

Self-propelled tunnel grouting trolley

The invention provides a self-propelled tunnel grouting trolley. The self-propelled tunnel grouting trolley comprises a rack, a platform, a main girder, a traveling mechanism and lead screw lifting jacks; the rack is an open-spandrel framework and is arranged on the traveling mechanism; the main girder is arranged on the rack; the platform comprises a working platform and lower platforms; the working platform is arranged on the main girder; the lower platforms are respectively arranged under the working platform at the two sides of the rack along the direction of a tunnel; one ends of the lower platforms are vertically fixed on the rack, the upper sides of the end parts of the other ends of the lower platforms are connected with the main girder through first supports, and the lower sides of the end parts of the other ends of the lower platform are connected with the rack through second supports; the two side end parts of the working platform and the two side end parts of the lower platforms are connected on the rack through inclined struts; the lead screw lifting jacks are symmetrically arranged at the two sides of the working platform and the lower platforms; and the self-propelled tunnel grouting trolley has the advantages of being reasonable in structure, low in cost, capable of solving the traffic problem in the tunnel, realizing the synchronization of grouting, transportation and other operations, meeting the requirements of the engineering construction of diversion tunnels with large-sized cross sections and being rapid and efficient in grouting operation and capable of ensuring the construction period.
Owner:中国水利水电第七工程局成都水电建设工程有限公司

Mined metro station second lining buckle arch construction method

The invention discloses a mined metro station second lining buckle arch construction method. The mined metro station second lining buckle arch construction method comprises the steps of making a mobile assembled mould base system with corresponding radian before the construction of a second lining buckle arch; labeling breaking length and height on a pilot tunnel initial support side wall to breaka pilot tunnel initial support; after the pilot tunnel initial support is broken, carrying out waterproof construction; after waterproof construction is finished, binding a second lining buckle archreinforcement; after the second lining buckle arch reinforcement is bound, mounting a template bracket; after the template bracket is mounted, pouring second lining buckle arch concrete; after the pouring is finished, carrying out the construction of the next section of second lining buckle arch; and meanwhile, arranging a steel tie rod on the just-finished previous section of second lining bucklearch; detaching an all-round supporting frame at the lower part of the previous section of template bracket; using a jack to release force; enabling an upper part mould base to fall on a mobile track; and using a chain block to pull the mould base system to advance. By improving the construction step sequence and the mobile assembled mould base system, resource input is effectively reduced, the building cost is reduced, and the construction efficiency is enhanced.
Owner:CHINA RAILWAY FIRST GRP SECOND ENG CO LTD +1

Construction method of pre assembling of water guide mechanism with participation of runner

ActiveCN108020147AAvoid secondary assemblySolve adjustment problemsMechanical measuring arrangementsArchitectural engineeringLow leakage
The invention discloses a construction method of pre assembling of a water guide mechanism with participation of a runner. The method comprises: a bottom ring and a lower leakage-stopping ring are installed, a wedge plate is placed on a lower plane of the lower leakage-stopping ring, and a runner participating in pre assembling is hoisted into a pit and is placed on the wedge plate; the center ofthe runner is adjusted by using an incremental launching method and the center of the runner is fixed by the wedge plate; a top cover is hoisted into the pit in a sectioning manner for assembling, theoverall top cover is suspended after assembling completion, a moving guide blade participating in pre assembling is hoisted, and then the top cover is put down for pre assembling; and the center of the top cover is adjusted by measuring a clearance value between the leakage-stopping ring on the top cover and a labyrinth ring on the runner, so that the concentricity of shaft holes of the top coverand the bottom ring is adjusted to meet the requirement. According to the invention, secondary splicing of the top cover is avoided while the construction quality is ensured; pre assembling of the water guide mechanism and a lower rack of a generator can be carried out synchronously; the construction process is optimized; the resource investment is reduced; the construction period is shortened; and the construction efficiency is improved.
Owner:SINOHYDRO BUREAU 5
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products