Evaluation Method Using Multi-tube Cement Slurry Settlement Stability Evaluation Device
A technology for evaluating equipment and cement slurry, which is applied in the field of cementing and can solve problems such as impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Evaluation of different cement slurry systems under the same conditions at the same time and at the same inclination angle.
[0029] Two different cement slurry systems 1 and 2 are tested using a multi-tube cement slurry settlement stability evaluation device equipped with at least two test tubes 1. Under normal pressure, the inclination angle is 45 degrees and the curing temperature is 90°C. , when the static time is 2 hours, evaluate the settlement stability of the two cement slurry systems; the steps are as follows:
[0030] 1) Prepare cement slurry system 1 and cement slurry system 2 respectively;
[0031] 2) Curing the two cement slurries at 90°C for 20 minutes in an atmospheric thickener;
[0032] 3) Pour the two cured cement slurries into two experimental cylinders respectively, and seal them with movable rubber plugs;
[0033] 4) Install the experimental cylinder 1 on the bracket 2 by using the fixing clips respectively, adjust the rotation angle of the experi...
Embodiment 2
[0045] Evaluation of the same cement slurry system with the same conditions and different well inclination angles at the same time
[0046] Using a multi-tube cement slurry settlement stability evaluation device equipped with at least two test tubes 1, the same cement slurry system is tested under normal pressure with a well inclination angle of 45 degrees and 30 degrees, a curing temperature of 90 °C, and a static time of 2 hours. In the case of , evaluate its settlement stability; the steps are as follows:
[0047] 1) Prepare the cement slurry system as required;
[0048] 2) Curing the cement slurry at 90°C for 20 minutes in an atmospheric thickener;
[0049] 3) Pour the cured cement slurry into two experimental cylinders respectively, and seal them respectively with movable rubber plugs;
[0050] 4) Install the experimental tubes 1 on the bracket 2 with fixing clips, adjust the rotation angle of one of the experimental tubes 1 to 45 degrees, and the other to 30 degrees, a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


