Tunnel initial support device and construction method
A primary support and tunnel technology, applied in tunnels, tunnel linings, shaft equipment, etc., can solve problems affecting the health of operators, slow spraying speed, and affecting tunnel construction progress, etc., to avoid sprayed concrete operations and simple structure , The effect of shortening the construction time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] figure 1 It is a structural schematic diagram of the present invention, figure 2 It is a schematic structural diagram of the supporting trolley of the present invention, image 3 It is a structural schematic diagram of the arc-shaped plate section of the present invention, Figure 4 for image 3 A partial schematic diagram of A, Figure 5 It is a schematic diagram of the structure of the support block of the present invention, as shown in the figure: the initial tunnel support device of this embodiment includes a support trolley, a formwork and an airbag assembly, and the support trolley includes a vehicle frame and a walking track arranged at the bottom of the vehicle frame. The vehicle frame includes a plurality of door-shaped support brackets arranged side by side along the length direction of the vehicle frame and a connecting beam 1 for connecting the door-shaped support brackets. The door-shaped support brackets are connected by connecting beams 1, and the str...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


