Gear steel 20CrMnTiH isothermal normalizing treatment method
A technology of isothermal normalizing and treatment method, applied in heat treatment equipment, heat treatment process control, manufacturing tools, etc., can solve the problems of unstable process, low pass rate, uneven hardness, etc., and achieve the effect of process stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The present invention is applied in the isothermal normalizing after forging of 40mm gear steel 20CrMnTiH gear blank, and the steps are as follows: (a) After austenitizing and heating, the warm air cooling process is adopted: in the first zone, the warm air temperature is 50°C, and the wind speed is controlled At 12m / s, the air cooling time of the parts is controlled at 3min; in the second zone, the air temperature is 55°C, the wind speed is 8m / s, and the air cooling time of the parts is controlled at 4min b) Adjust the isothermal normalizing furnace into two stages of control: the first stage The temperature is controlled at 550°C, and the holding time is 1.5h; the temperature of the second stage is controlled at 570°C, and the isothermal time is 1.5h. (c) After isothermal normalizing, enter the air-cooled room, control the air temperature at 30°C and the wind speed at 8m / s, cool to 250°C, and then air-cool. The hardness of the tooth blank treated by this process can r...
Embodiment 2
[0035] The present invention is applied in isothermal normalizing after forging a 30mm gear steel 20CrMnTiH tooth blank, and the steps are as follows:
[0036] (1) Warm air partition cooling process is adopted after austenitizing heating: in the first area, the warm air temperature is 55°C, the wind speed is controlled at 8m / s, and the air cooling time of parts is controlled at 2min; in the second area, the air temperature is 60°C, and the wind speed 5m / s, the air cooling time of parts is controlled at 3min
[0037] (2) Adjusting the isothermal normalizing furnace is divided into two stages of control: the temperature of the first stage is controlled at 570°C, and the holding time is 1h; the temperature of the second stage is controlled at 600°C, and isothermal for 1h.
[0038] (3) After isothermal normalizing, enter the air-cooled room, the air temperature is controlled at 40°C, the wind speed is controlled at 5m / s, and after cooling to 200°C, it is air-cooled. The hardness ...
PUM
Property | Measurement | Unit |
---|---|---|
hardness | aaaaa | aaaaa |
hardness | aaaaa | aaaaa |
hardness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com