Outdoor construction elevator foundation reinforcing apparatus
A construction elevator and foundation reinforcement technology, which is applied in infrastructure engineering, foundation structure repair, construction, etc., can solve problems such as insufficient compactness and uneven settlement of construction elevator foundations, achieve good force transmission effect, and avoid uneven settlement , the effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Such as figure 1 Shown, a kind of outdoor construction elevator foundation reinforcing device comprises building exterior wall 6, indoor reinforced concrete floor slab 8, original soil layer 4, I-beam 1 and construction elevator foundation 5, and described building exterior wall 6 and described original soil There is backfill soil 10 between the layers 4, and the building exterior wall 6 is provided with installation holes 9, and a concrete cushion 3 is poured on the original soil layer 4, and the concrete cushion 3 can improve the stress strength of the construction elevator foundation 5, Two round bars 2 are pre-embedded on the concrete cushion 3, and the root of the installation hole 9, the upper surface of the indoor reinforced concrete floor 8 and the upper surface of the concrete cushion 3 are all located on the same horizontal plane, so that Make the force-bearing surface of the bearing construction elevator foundation 5 uniformly stressed. One end of the I-beam...
Embodiment 2
[0025] The difference from Example 1 is that a round steel 2 is pre-embedded on the concrete cushion 3 .
Embodiment 3
[0027] The difference from Example 1 is that one end of the I-beam 1 is fixedly installed on the indoor reinforced concrete floor 8 through a fixed iron block 7, and the side of the fixed iron block 7 is fixed on the outer wall 6 of the building. On the inner surface, this setting can strengthen the fixed installation of one end of the I-beam 1, so that the elevator is not easy to move during construction and avoids danger.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com