A technology for tunneling and model testing, which is applied to the testing of machines/structural components, instruments, measuring devices, etc., and can solve the problem of inability to simulate the effect of the rotation of the roadheader on the excavation surface, single function of the roadheader model, and low scalability and other issues to achieve the effect of shortening the design and production cycle, reducing labor intensity and facilitating maintenance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Example 1 (simulation of mud-water balance shield)
[0035] like figure 1 As shown, the multifunctional micro-shield tunnel model test system of the present invention includes four parts: a test platform 1 , a micro-tunnel boring machine 2 , a mud circulation system 3 and a power control system 4 . The mud-water balance shield tunnel excavation model test can be carried out through the test system.
[0036] Before the test, first install the test platform 1, such as figure 2 shown. The test platform 1 is composed of aluminum alloy square tube profile beams and columns 5 through connectors 6 to assemble the frame structure, and the platform steel plate 7 is fixed on the upper part of the test platform 1 by bolts. There are leveling bolts 8 under the four table feet of the test platform 1, and the leveling bolts 8 should be adjusted before the test so that the platform steel plate 7 is in a horizontal state. The test platform 1 is fixed on the ground through anchors 9 ...
Embodiment 2
[0042] Example 2 (simulation of earth pressure balance shield)
[0043] like figure 1 As shown, the multifunctional micro-shield tunnel model test system of the present invention includes four parts: a test platform 1 , a micro-tunnel boring machine 2 , a mud circulation system 3 and a power control system 4 . The excavation model test of earth pressure balance shield tunnel can be carried out by this test system.
[0044] according to Figure 1~Figure 5 Install and configure the test system.
[0045] When simulating the earth pressure balance shield, it is necessary to adopt the opening sealing plate 28, cancel the waste slurry tank 45, the slurry outlet pipe 48, the slurry outlet pressure gauge 49 and the slurry inlet pressure gauge 47, and replace the mud in the mud pool 44 as a lubricant (water or Foam).
[0046] like Figure 6 As shown, four first bolt holes 29 are opened on the upper part of the opening sealing plate 28 for connecting with the rotating power system;...
Embodiment 3
[0048] Embodiment 3 (simulated rock tunnel boring machine)
[0049] like figure 1 As shown, the multifunctional micro-shield tunnel model test system of the present invention includes four parts: a test platform 1 , a micro-tunnel boring machine 2 , a mud circulation system 3 and a power control system 4 . The rock tunnel excavation model test can be carried out through the test system.
[0050] according to Figure 1~Figure 5 Install and configure the test system.
[0051] When simulating a rock tunnel boring machine, the opening sealing plate 28 is used, and the earth pressure box 35 is canceled. In the rock tunnel simulation test, rock-like materials (gypsum, cement, etc.) are generally used to simulate the rock mass, and the existence of water is not considered, so no mud or lubricant is needed, so the mud circulation system 3 is cancelled.
[0052] In the test preparation stage, the first part of the multifunctional micro-shield tunnel model test system is assembled a...