Universal displacement compensation type prefabricated inspection well
A prefabricated assembly and displacement compensation technology, applied in construction, artificial island, infrastructure engineering, etc., can solve problems such as affecting the driving of vehicles, destroying manholes, increasing vehicle loss and urban noise, reducing construction costs, improving sealing effect, The effect of reducing labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Embodiment one: if figure 1 and figure 2 As shown, the universal displacement compensation type prefabricated inspection well of the present invention includes a bottom plate 1, a first cylinder 2 and several second cylinders 3, the bottom plate 1 is arranged horizontally, the first cylinder 2 and all the second cylinders The centerlines of 3 coincide and the centerline is set along the vertical direction, all the second cylinders 3 are stacked up and connected sequentially from top to bottom, the lower end surface of the lowermost second cylinder 3 is connected to the upper end surface of the first cylinder 2, The lower end surface of the first cylinder 2 is fixed on the upper surface of the bottom plate 1, the first cylinder 2 and the bottom plate 1 are integrally manufactured, and the bottom plate 1, the first cylinder 2 and the second cylinder 3 are all prefabricated by reinforced concrete; At least two pipe passing through holes 4 are provided on the side of the ...
Embodiment 2
[0032] Embodiment 2: The difference between this embodiment and Embodiment 1 is that, as Figure 4 As shown, the pipe joint includes a support tube 14, a mounting tube 15 and a rubber tapered sleeve 16. The support tube 14 is provided with two sections, and the two-section support tube 14 is installed in the through-hole 4 of the pipeline. The support tube 14 The outer wall is in sealing contact with the inner wall of the pipeline passing through hole 4, and there is an annular gap between the two support tubes 14, and the inner wall of the pipeline passing through hole 4 is provided with an annular groove, and the installation cylinder 15 is arranged in the annular groove, and the rubber tapered sleeve 16 The thicker end passes through the gap and is fixedly connected to the inner wall of the installation cylinder 15 , and the thinner end of the rubber conical sleeve 16 extends inwards to the inside of the first cylinder 2 .
[0033] In addition, in order to increase the seal...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


