An irregular and linear technology, applied in the direction of columns, pier columns, pillars, etc., can solve the problems of difficult operation of steel bar binding, limited bearing capacity, complex construction, etc., and achieve easy transportation and operation, high operating efficiency and improved construction efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The present invention will be further described below in conjunction with the accompanying drawings.
[0033] like figure 1 , figure 2 and image 3 As shown, a method for lap splicing of building columns and piers applied to irregular lines includes the following steps:
[0034] 1) Hollow steel frame plate threading: Insert the central hollow opening (12) on the hollow steel frame plate and the steel bar column (2) correspondingly through the socket, and insert the side hollow port (13) and the steel bar (21) correspondingly Put through the sleeve, connect the hollow steel frame plate (1) in series on the steel bar column (2), and carry out welding continuous connection of the steel bar column (2) and the steel bar (21), and connect the steel bar column (2) and the steel bar ( 21) Extend until the length of the drawing design is reached, so that a row of hollow steel frame plates (1) are connected in series on the reinforcement column (2);
[0035] 2) Reinforcement...