Small-diameter micro static-pressure steel pipe pile post-grouting construction method

A technology of static pressure steel pipe piles and construction methods, applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of adverse effects of surrounding pipelines or adjacent buildings, high total construction cost, and affecting the quality of grouting, etc. It achieves the effects of inconspicuous soil squeezing effect, high construction efficiency and low comprehensive cost

Inactive Publication Date: 2017-11-17
HUAIHAI INST OF TECH
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The static pressure type needs to be able to provide the pile pressure reaction device on site. The pile pressure efficiency is low when the pile body is long or the pile diameter is large, and the large pile diameter will produce obvious soil squeezing effect, which will adversely affect the surrounding pipelines or adjacent buildings.
The pre-drilled embedded type needs to be drilled first and then placed in the steel pipe pile. When the soil condition is poor, the hole is prone to collapse and affect the quality of subsequent grouting. In addition, a large amount of mud will be discharged at the same time, causing environmental pollution. higher total cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] A post-grouting construction method for small-diameter miniature static pressure steel pipe piles, specifically comprising the following steps:

[0026] Step 1: Small-diameter steel pipes are cut into sections on site, and the pipe wall is opened. Among them, the steel pipe pile diameter is 70-140mm, the length of each steel pipe is 3-6m, the total length of the pile foundation is 9-15m, and each steel pipe is processed After the completion, it is statically pressed into the soil in sections, and the steel pipes of each section are connected by welding or sleeves, and the pile tip is welded under the steel pipe at the bottom;

[0027] Step 2. After the static pressure steel pipe pile reaches the design position, put the water jet pipe into the steel pipe, and use water pressure to clean up a small amount of soil that enters the steel pipe through the pipe wall hole during the pile pressing process;

[0028] Step 3: After cleaning the inside of the steel pipe, put the fi...

Embodiment 2

[0034] A post-grouting construction method for small-diameter miniature static pressure steel pipe piles, specifically comprising the following steps:

[0035] Step 1: Small-diameter steel pipes are cut into sections on site, and the pipe wall is opened. Among them, the steel pipe pile diameter is 70-140mm, the length of each steel pipe is 3-6m, the total length of the pile foundation is 9-15m, and each steel pipe is processed After the completion, the static pressure is inserted into the soil in sections; between each section of steel pipe, sleeve connection or welding is used when the pile diameter does not exceed 100mm, and welding is used when the pile diameter exceeds 100mm; 1.3-1.5 times of that.

[0036] The opening position of the steel pipe wall vertically from the pile tip does not exceed 2 / 3 of the total length of the pile body. Each section of the steel pipe wall can be symmetrically opened at 1-2 positions, and the shape of the opening is not limited. The size sh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a small-diameter micro static-pressure steel pipe pile post-grouting construction method. The method comprises the specific procedures of small-diameter steel pipe pile manufacturing, pile pressing, steel pipe inner wall cleaning, gravity grouting, pressure grouting, static curing and concrete casting. In the micro static-pressure steel pipe pile post-grouting construction method, firstly, a small-diameter steel pipe is pressed into a soil layer; after the inner wall of the steel pipe is cleaned by using the water pressure, a finish-rolled thread reinforcement is put into the steel pipe pile, and grouting is performed, so that the small-diameter steel pipe is low in pile pressing resistance and pile body stress, is not obvious in soil extrusion effect, guarantees the perpendicularity, and is high in construction efficiency and low in comprehensive cost; and in addition, as the finish-rolled thread reinforcement is additionally arranged in the steel pipe, on the one hand, the drawing resistance of the reinforcement is used, and on the other hand, subsequent connection with a foundation is convenient. Meanwhile, a staging post-grouting method is adopted to improve a mixing effect between cement paste and soil around a pile foundation so as to prominently improve the bearing performance.

Description

technical field [0001] The invention relates to the technical field of micro-steel pipe pile foundation construction, in particular to a post-grouting construction method for small-diameter micro static-pressure steel pipe piles. Background technique [0002] Micro steel pipe pile foundation refers to the steel pipe pile foundation with a diameter of no more than 300mm and a ratio of pile length to pile diameter of no less than 30. It is mostly used in reinforcement and renovation projects of buildings, bridges, and transmission line equipment foundations. At present, there are four main construction methods for micro-steel pipe pile foundations: hammering type, auger drilling type, static pressure type and pre-drilled hole embedding type. The hammering type refers to the construction method of driving steel pipe piles into the soil layer; the auger drilling type refers to the construction method of pressing the steel pipe piles with threads on the pile body into the soil la...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38E02D7/20E02D15/04
CPCE02D5/38E02D7/20E02D15/04E02D2250/003
Inventor 宗钟凌李青松宋明志吕凤伟姚锦文武江传张振东
Owner HUAIHAI INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products