[0028] A heat treatment process for mold Cr12MoV steel, its main chemical composition is: C: 1.45-1.70; Si: ≤0.40; Mn: ≤0.40; S: ≤0.03; P: ≤0.03; Cr: 11-12.5; Ni : ≤0.25; Cu: ≤0.30; V: 0.15~0.30; Mo: 0.40~0.60, the specific process steps of heat treatment are as follows:
[0029] A. First, put the die steel into a box furnace and heat it to 865°C, and keep it in the box furnace for 2.5 hours.
[0030] B. Cool down to 460°C in a box furnace, take out the mold steel from the box furnace, air cool it, then put it into the box furnace, heat it to 1015°C, and keep it warm for 2.5 hours.
[0031] C, be cooled to 925 ℃ in box type furnace, insulation 1.5 hours.
[0032] D. Take the die steel out of the box furnace and put it into 40-70 quenching oil for cooling.
[0033] E. Put the mold steel cooled in the oil into the box furnace, heat it to 275°C, keep it warm for 6.5 hours, cool it to 100°C in the box furnace, take it out from the box furnace, and carry out air Free to cool.
Embodiment 2
[0035] A heat treatment process for mold Cr12MoV steel, its main chemical composition is: C: 1.45-1.70; Si: ≤0.40; Mn: ≤0.40; S: ≤0.03; P: ≤0.03; Cr: 11-12.5; Ni : ≤0.25; Cu: ≤0.30; V: 0.15~0.30; Mo: 0.40~0.60, the specific process steps of heat treatment are as follows:
[0036] A. First, put the die steel into a box furnace for heating, heat it to 870°C, and keep it in the box furnace for 3.5 hours.
[0037] B. Cool down to 460°C in a box furnace, take out the mold steel from the box furnace, air cool it, then put it into the box furnace, heat it to 1025°C, and keep it warm for 3.5 hours.
[0038] C, be cooled to 930 ℃ in box type furnace, insulation 1.7 hours.
[0039] D. Take the die steel out of the box furnace and put it into 40-70 quenching oil for cooling.
[0040] E. Put the mold steel cooled in the oil into the box furnace, heat it to 285°C, keep it warm for 7 hours, cool it to 100°C in the box furnace, take it out from the box furnace, and carry out air Free to c...
Embodiment 3
[0042] A heat treatment process for mold Cr12MoV steel, its main chemical composition is: C: 1.45-1.70; Si: ≤0.40; Mn: ≤0.40; S: ≤0.03; P: ≤0.03; Cr: 11-12.5; Ni : ≤0.25; Cu: ≤0.30; V: 0.15~0.30; Mo: 0.40~0.60, the specific process steps of heat treatment are as follows:
[0043] A. First, put the mold steel into a box furnace for heating, heat it to 875°C, and keep it in the box furnace for 4.5 hours.
[0044] B. Cool down to 460°C in a box furnace, take out the die steel from the box furnace, air cool it, then put it into the box furnace, heat it to 1035°C, and keep it warm for 4.5 hours.
[0045] C, be cooled to 935 ℃ in box type furnace, insulation 2 hours.
[0046] D. Take the die steel out of the box furnace and put it into 40-70 quenching oil for cooling.
[0047] E. Put the mold steel cooled in the oil into the box furnace, heat it to 295°C, keep it warm for 7.5 hours, cool it to 100°C in the box furnace, take it out from the box furnace, and carry out air Free to c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com