A Construction Technology of Soft Soil Foundation
A construction technology and technology of soft soil foundation, applied in soil protection, infrastructure engineering, roads, etc., can solve the problems of cracking, reducing the service life of immersed tubes, deformation of immersed tubes, etc., to improve the bearing capacity, the construction process is simple, the The effect of improving the tightness of the connection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0036] The preparation method of acrylate copolymer is as follows:
[0037] Add 100kg methyl methacrylate, 240kg hydroxyethyl acrylate, 100kg water, 15kg sodium lauryl sulfate and 5kg potassium persulfate into the emulsifier, turn on the stirring for emulsification, the stirring speed is 75r / min, and then heat up to After reacting for 3 hours at 70°C, lower the temperature, adjust the pH value to 7, and then dry in a high-temperature oven at 200°C for 2 hours to obtain an acrylic copolymer with a high viscosity.
[0038] The preparation method of geomembrane is as follows:
[0039] A film blowing machine is used to blow the modified polyvinyl chloride. The modified polyvinyl chloride is composed of the following components by weight: 70kg PVC, 30kg chlorinated polyethylene, 10kg cellulose adhesive, 5kg composite stabilizer, 3kg Filler oil and 2kg antioxidant.
[0040] The preparation method of the concrete bonding layer is as follows:
[0041] Blend 30kg of concrete, 70kg o...
Embodiment 1
[0043] A construction technique for soft ground, comprising the steps of:
[0044] (1) Delineate the construction scope, excavate the subgrade groove on the soft foundation, the depth is 2m, excavate the silt, soft flushing soil and miscellaneous filling, and fill the first sandstone layer to the bottom of the subgrade groove;
[0045](2) The first sandstone layer is followed by gravel soil layer, plain soil layer and lime soil layer from bottom to top, and the thickness of gravel soil layer, plain soil layer and lime soil layer is 60cm, 30cm and 30cm in turn;
[0046] (3) After laying the lime soil layer, use a 60kN light road roller to dry press twice; then use an 80kN medium-sized road roller to sprinkle water and roll twice; finally use soil caulking, and use a 120kN heavy-duty road roller to roll once;
[0047] (4) Cover the first gravel layer with a geomembrane and seal around it;
[0048] (5) A vacuum pump is used to pump air in the first sandstone layer, so that the f...
Embodiment 2
[0054] A construction technique for soft ground, comprising the steps of:
[0055] (1) Delineate the construction scope, excavate the subgrade groove on the soft foundation, the depth is 2m, excavate the silt, soft flushing soil and miscellaneous filling, and fill the first sandstone layer to the bottom of the subgrade groove;
[0056] (2) The first sandstone layer is followed by gravel soil layer, plain soil layer and lime soil layer from bottom to top, and the thickness of gravel soil layer, plain soil layer and lime soil layer is 50cm, 30cm and 30cm in turn;
[0057] (3) After laying the lime soil layer, use a 60kN light-duty road roller to dry-roll 3 times; then use a 100kN medium-sized road roller to sprinkle water and roll 3 times; finally use soil caulking, and use a 120kN heavy-duty road roller to roll once;
[0058] (4) Cover the first gravel layer with a geomembrane and seal around it;
[0059] (5) A vacuum pump is used to pump air in the first sandstone layer, so t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |