[0052] Relying on the curtain grouting construction of the ultra-shallow buried tunnels crossing the main urban road under the conditions of water-rich and weak surrounding rocks in the sea;
[0053] A certain tunnel goes under the urban traffic arteries and is close to the viaduct piers. The surface traffic volume is large, the pipelines are dense, there are more than 20 6 types of pipelines, and some unknown pipelines;
[0054] The buried depth of the underpass section is relatively shallow (5.4~14.3m), and the stratum in the vault area is mainly mixed fill, silt, residual soil, fully weathered granite, and it is connected to seawater, with poor self-stabilization ability, and the maximum daily water inflow is 1700m 3 , The entire tunnel is below the normal water level;
[0055] The entire grouting process is as follows:
[0056] ① Hole distribution: The excavation section is 58.99 square meters, and the upper half section is filled with full-face grout. There are 120 grouting holes,...