Method for handling with muck foundation through combination of layered drainage method and interconnected frequency-variable vibrating roller
A technology of drainage method and combination, which is applied in soil protection, infrastructure engineering, construction, etc., to achieve the effect of reducing the cost of external transportation of muck, reducing environmental pollution, and achieving significant economic benefits.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Example 1, the average thickness of the muck layer in a muck landfill site is 4m, the moisture content is 40%, and the bearing capacity of the foundation is 2t. The specific treatment and construction steps are as follows:
[0051] (1) Clear and level the muck landfill site, and lay plastic grids. Among them, the specification of the plastic grid is 10×10cm, and the tensile strength is 35kN / m 2 , to solve the problem of personnel and mechanical construction entering the site.
[0052] (2) Set up a vertical drainage body. The drainage adopts SPB-B plastic drainage board with a depth of 7m and a square layout of 1.1×1.1m. Install the monitoring system (settlement mark, piezometer), modulation system, and start data collection , record the initial data.
[0053] (3) Lay pond slag with a thickness of 1m, as a cushion layer for gravity load and IOT frequency conversion vibrating roller.
[0054] (4) The initial vibration frequency of the Wulian frequency conversion vibrat...