Overhead contact system mast foundation of railway steel and concrete composite beam and steel and concrete composite bridge
A combination of steel-concrete beams and steel-concrete combination technology, applied in infrastructure engineering, bridges, bridge construction, etc., can solve the problems of complex and changeable bridge structure stress, inconvenient column distribution, heavy column weight, etc., to reduce design Strength and construction difficulty, reduce design difficulty and construction difficulty, and increase construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as Figure 1-3 As shown, the catenary column foundation of a railway steel-concrete composite beam according to the present invention includes a bridge flange, and the bridge flange is connected to one side of the main beam 6, and the bridge flange includes a reinforced concrete layer 1 and Supporting parts, the reinforced concrete layer 1 and the bridge deck concrete are integrally molded and poured, one supporting part is provided under each column 2, and each supporting part includes a top plate 41, a web 42 and a bottom plate 43, Two webs 42 are arranged below each column 2, and a bottom plate 43 is connected to the bottom of each web 42, and all webs 42 are vertically connected to the top plate 41, each The bottom plate 43 is perpendicular to the corresponding web 42, all the top plates 41, webs 42 and bottom plates 43 are steel structural members, all the top plates 41 are welded to the main beam 6, all the webs 42 and The bottom plate 43 is spliced with t...
Embodiment 2
[0033] Such as Figure 4 As shown, a steel-concrete combined bridge according to the present invention includes a superstructure, a substructure, a bearing system and ancillary facilities. The superstructure includes several main girders 6, and the two sides of each main girder 6 Respectively connected with catenary column foundations as described in embodiment 1, the main girder 6 is a steel plate girder or a steel box girder or a steel truss girder, such as a steel box girder, the top plate 41 is welded and connected to the steel box girder top plate, all the The web 42 and the bottom plate 43 are spliced with the side of the steel box girder through high-strength bolts and splicing plates. A stiffening plate 7 is provided at the corresponding position connecting each of the supporting components on the main girder 6. The reinforced concrete layer 1 and the bridge deck concrete on the main girder 6 are integrally poured and formed, and the substructure includes abutment co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com