A construction method and technology of steel box girders, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of project progress impact, damage to the permanent structure of steel box girders, and large hydrological constraints, so as to achieve protection, Avoid shaking effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as figure 1 , 3 In -5, a steel box girder hoisting limit buffer construction method, the steel box girder 3 is hoisted to the bridge deck 4 by a lifting device, and the bridge deck 4 is provided with a lateral limit mechanism 5 and a vertical The buffer mechanism 6, the steel box girder 3 hoisted by the lifting device is buffered by the lateral limit mechanism 5 and the vertical buffer mechanism 6 and smoothly hoisted to a designated position.
Embodiment 2
[0042] On the basis of embodiment 1, the hoisting operation of the steel box girder specifically includes the following steps:
[0043] 1) Transport the steel box girder 3 to the sea area on the side of the bridge deck 4 by means of the transport barge 2;
[0044] 2) dock the crane ship 1 on the side of the transport barge 2, and realize the positioning on the water surface by positioning the anchor cable 8;
[0045] 3) The steel box girder 3 on the transport barge 2 is hoisted by the crane ship 1;
[0046] 4) The steel box girder 3 is hoisted above the vertical buffer mechanism 6 in the drop beam area on the bridge deck 4;
[0047] 5) Connect the traction rope reserved for the steel box girder 3 with the longitudinal bridge-direction traction winch 7 on the bridge deck 4;
[0048] 6) Tighten the reserved traction rope connected to the longitudinal bridge to the traction winch 7, and restrain the movement of the steel box girder 3 in the direction of the longitudinal bridge;...
Embodiment 3
[0056] On the basis of Embodiment 1, the lateral limiting mechanism 5 is fixed on the bracket, and the bracket is fixedly arranged on the bridge deck 4 .
[0057] Described lateral limit mechanism 5 and vertical buffer mechanism 6 all adopt oil cylinder, and the cylinder piston rod in described lateral limit mechanism 5 is arranged horizontally, and the oil cylinder piston rod in described vertical buffer mechanism 6 is vertical. Set straight up.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com