A Construction Method for Lifting and Limiting Buffering of Steel Box Girders

A construction method and technology of steel box girders, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of project progress impact, damage to the permanent structure of steel box girders, and large hydrological constraints, so as to achieve protection, Avoid shaking effects

Active Publication Date: 2021-02-23
CCCC SECOND HARBOR ENG +2
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the bridge construction project in the swell sea area, for the above-mentioned third steel box girder installation and construction method, when using small and medium-sized cranes to hoist the steel box girder segment from the transport barge to the poured reinforced concrete bridge deck, due to the waves The motion response of the crane ship and the transport barge, on the one hand, there is a potential collision risk at the moment when the steel box girder segment is hoisted away from the barge; The vertical forced vibration will lead to the failure of the hoisting operation, and even damage the permanent structure such as the steel box girder to be installed when it is placed, causing unnecessary economic losses
[0004] The existing Chinese patent "Large tonnage box girder launch system and construction method" (application number 201010621058.X) discloses a method for transporting and erecting box girders in the construction of offshore bridges, which mainly relies on setting up on the wharf in the construction area Aisle girders, and the use of walking carts on the aisle girders to transport the box girders can effectively avoid the impact of water levels, but the amount of preparation work is relatively large, and the dismantling of the aisle girders is required after the completion of the box girder erection. Undoubtedly, it will affect the progress of the entire project. In addition, when the girder erection area is located at the center of the entire project, the traveling distance of the traveling cart to transport the box girder is relatively long. Due to the heavy weight of the box girder, the transport speed of the traveling cart is relatively slow , so the construction efficiency will inevitably decrease
[0005] The existing Chinese patent "A method for erecting steel box girders for waterway transportation on strong tidal sea areas" (application number 201310010008.1) discloses a hypothetical method for box girder transportation on strong tidal sea areas. The hydrological changes in the tidal waters, and after confirming that the hydrological conditions meet the operation conditions of the box girder transportation and erection through sea trials, the operation is carried out, but it is greatly restricted by the hydrological conditions. When the hydrological conditions do not meet the operation requirements, the box girder cannot be transported and erected. , which affects the construction progress, and the preparatory work of "research on the hydrological change law of the strong tidal sea area where the channel bridge needs to be built" also takes a certain amount of time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Method for Lifting and Limiting Buffering of Steel Box Girders
  • A Construction Method for Lifting and Limiting Buffering of Steel Box Girders
  • A Construction Method for Lifting and Limiting Buffering of Steel Box Girders

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0040] Such as figure 1 , 3 In -5, a steel box girder hoisting limit buffer construction method, the steel box girder 3 is hoisted to the bridge deck 4 by a lifting device, and the bridge deck 4 is provided with a lateral limit mechanism 5 and a vertical The buffer mechanism 6, the steel box girder 3 hoisted by the lifting device is buffered by the lateral limit mechanism 5 and the vertical buffer mechanism 6 and smoothly hoisted to a designated position.

Embodiment 2

[0042] On the basis of embodiment 1, the hoisting operation of the steel box girder specifically includes the following steps:

[0043] 1) Transport the steel box girder 3 to the sea area on the side of the bridge deck 4 by means of the transport barge 2;

[0044] 2) dock the crane ship 1 on the side of the transport barge 2, and realize the positioning on the water surface by positioning the anchor cable 8;

[0045] 3) The steel box girder 3 on the transport barge 2 is hoisted by the crane ship 1;

[0046] 4) The steel box girder 3 is hoisted above the vertical buffer mechanism 6 in the drop beam area on the bridge deck 4;

[0047] 5) Connect the traction rope reserved for the steel box girder 3 with the longitudinal bridge-direction traction winch 7 on the bridge deck 4;

[0048] 6) Tighten the reserved traction rope connected to the longitudinal bridge to the traction winch 7, and restrain the movement of the steel box girder 3 in the direction of the longitudinal bridge;...

Embodiment 3

[0056] On the basis of Embodiment 1, the lateral limiting mechanism 5 is fixed on the bracket, and the bracket is fixedly arranged on the bridge deck 4 .

[0057] Described lateral limit mechanism 5 and vertical buffer mechanism 6 all adopt oil cylinder, and the cylinder piston rod in described lateral limit mechanism 5 is arranged horizontally, and the oil cylinder piston rod in described vertical buffer mechanism 6 is vertical. Set straight up.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A steel box girder hoisting limit buffer construction method, the steel box girder is hoisted to the bridge surface by a lifting device, the bridge surface is provided with a lateral limit mechanism and a vertical buffer mechanism, the lifting device hoisting The steel box girder is buffered and stably hoisted to the designated position through the lateral limit mechanism and the vertical buffer mechanism. Using the above method, the box girder transportation and hoisting operation in the strong tidal sea area can be realized, and compared with the existing technology, the preparation work before the hoisting operation is simple, and the whole hoisting operation process is less affected by the hydrological conditions, which can effectively improve the hoisting operation. efficiency.

Description

technical field [0001] The invention relates to the field of offshore bridge construction, in particular to a steel box girder hoisting limit buffering construction method. Background technique [0002] There are usually three construction methods for the installation of bridge steel box girders: one is the overall hoisting of the crane ship, which has the advantages of high efficiency, but it needs to be equipped with a large crane ship; the second is the segmental hoisting of the bridge deck crane, which is economical , but the construction efficiency is low; the third is to hoist the steel box girder segments to the poured reinforced concrete bridge deck in pieces, after welding and assembling, the overall push is completed to complete the installation. This method combines the overall hoisting of the crane ship and the bridge deck crane Advantages of machine split hoisting. [0003] In the bridge construction project in the swell sea area, for the above-mentioned third ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 张鸿杨秀礼林树奎刘修成华晓涛游新鹏程多云李宁徐杰程茂林夏昊孟奎朱明清吴中正
Owner CCCC SECOND HARBOR ENG
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More