Inverted Concrete Construction Technology with Mechanical Automatic Vibration Equipment
A concrete and automatic technology, applied in mining equipment, shaft equipment, earth-moving drilling, etc., can solve the problems of small working space under the trestle, high labor intensity of operators, and large error in surface elevation, so as to improve the labor environment and save energy. Operation time, ensure the effect of safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] A mechanical automatic vibrating equipment for inverted arch concrete construction technology, specifically comprising the following steps:
[0018] Step 1: Arrange safety protection nets on the outside of the trusses on both sides of the trestle to prevent the fall of soil or gravel from causing damage to the construction operators below, and install dust-proof equipment on the construction site to reduce oil and dirt generated during the construction process. Pollution of the surrounding environment by waste materials;
[0019] Step 2: Install the rails under the left and right longitudinal beams of the inverted trestle bridge, fasten the rails tightly to both ends of the trolley with bolts, set a fixed point every 40cm with a level ruler and wedges, and fix each fixed point with six bolts , When fixing, ensure that the distance between the rail and the positioning center line of the trolley is the same, and the gauge error is controlled within 10mm;
[0020] Step 3:...
Embodiment 2
[0025] A mechanical automatic vibrating equipment for inverted arch concrete construction technology, specifically comprising the following steps:
[0026] Step 1: Arrange safety protection nets on the outside of the trusses on both sides of the trestle to prevent the fall of soil or gravel from causing damage to the construction operators below, and install dust-proof equipment on the construction site to reduce oil and dirt generated during the construction process. Pollution of the surrounding environment by waste materials;
[0027] Step 2: Install the track under the left and right longitudinal beams of the inverted arch trestle, fasten the track to both ends of the trolley tightly with bolts, set a fixed point every 50cm with a level ruler and wedges, and fix each fixed point with six bolts , When fixing, ensure that the distance between the rail and the positioning center line of the trolley is the same, and the gauge error is controlled within 10mm;
[0028] Step 3: S...
Embodiment 3
[0033] A mechanical automatic vibrating equipment for inverted arch concrete construction technology, specifically comprising the following steps:
[0034] Step 1: Arrange safety protection nets on the outside of the trusses on both sides of the trestle to prevent the fall of soil or gravel from causing damage to the construction operators below, and install dust-proof equipment on the construction site to reduce oil and dirt generated during the construction process. Pollution of the surrounding environment by waste materials;
[0035] Step 2: Install the rails under the left and right longitudinal beams of the inverted trestle bridge, fasten the rails tightly to both ends of the trolley with bolts, set a fixed point every 60cm with a level ruler and wedges, and fix each fixed point with six bolts , When fixing, ensure that the distance between the rail and the positioning center line of the trolley is the same, and the gauge error is controlled within 10mm;
[0036] Step 3:...