Fill mining method using concrete components to assemble bottom columns
A filling mining and concrete technology, which is applied in the direction of filling, ground mining, mining equipment, etc., can solve the problems of high cutting ratio of 1,000 tons, lower recovery rate, and easy collapse and damage of the bottom column, so as to solve the complex process and reduce ore Loss, the effect of improving the recovery rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Such as Figure 1~4 Shown, a kind of filling mining method that utilizes concrete member to assemble bottom column, it is characterized in that: comprise the following steps:
[0020] (1) Ore block layout: Divide the ore body into stages in the height direction, and divide the stages into ore blocks along the ore body direction. 2-3 ore blocks can be arranged at the same time. The length of the ore block is 60m, and the width of the ore body is Thickness, pedestrian shafts and mine shafts are arranged every 60m along the vein-piercing roadway, and the cross-sectional size of the pedestrian shafts and mine shafts is 2.0mx2.0m;
[0021] (2) Mining and cutting: Arrange the stage transportation roadway along the ore body trend, draw the bottom in the lower vein of the ore body perpendicular to the ore body trend, the bottom height is 5m, and use concrete in the space where the bottom of the ore block is pulled down. Assemble the bottom column with the components, and build...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 