Facade surveying and mapping method
A technology of facade and survey site, applied in the field of surveying and mapping, can solve problems such as difficult image recognition
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] Embodiment one: a kind of elevation surveying and mapping method, comprises a. station station is set, coordinates of station station, basic data are input in the total station, finishes the setting of survey point; Input into the total station to complete the setting of the backsight point; c. collect data of different observation points and record the three coordinate values of N, E, and Z; d. transmit the data in the memory of the total station to the computer through data communication to generate DAT format data file; e. exchange the positions of N and E, N and Z, and E and Z respectively to obtain three different sets of data; f. open the southern CASS 9.1 digital topographic cadastral mapping system to The numerical points of the three combinations are processed separately to obtain three spread point maps; e. Select the one of the three spread points that is most in line with the actual building as the point spread map.
Embodiment 2
[0026] Embodiment two: a kind of facade surveying and mapping method, and the difference of embodiment one is: measurement content mainly comprises building inflection point coordinates, building structure, number of floors etc.; Building indoor floor, outdoor ground elevation; Building height ( The vertical distance from the indoor floor to the shading point); the height of the building (indoor clear height plus the thickness of the floor slab); the position of windows and balconies on the sunny side of the building.
[0027] Before the measurement, it is necessary to make preparations. Before the inspection, it is necessary to prepare for the charging of the instrument, accessories, tools, drawings, materials, recording supplies, etc., so as to avoid insufficient preparation and affect the operation.
[0028] When setting up the station, input the height, temperature and pressure of the total station itself, prism constant and other values into the total station, and the ce...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More