Pile foundation pore-forming method capable of efficiently recycling slurry
A mud and high-efficiency technology, applied in earth-moving drilling, wellbore/well components, construction, etc., can solve the problems of ground damage, difficult treatment, pollution discharge, etc., to reduce the amount of waste mud treatment, avoid water waste, The effect of avoiding environmental pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] In order to make the object-technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Apparently, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other implementations obtained by persons of ordinary skill in the art without making creative efforts fall within the protection scope of the present invention.
[0031] The technical solution of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0032] A pile foundation hole forming method in which mud can be efficiently recycled. A heightened steel casing 1 is buried on the pile site so that the upper part of the heightened steel casing 1 is exposed to the ground. The dregs and mud mixture communication pipe 2 on the high-section steel casing 1 is discharged to the se...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


