A prefabricated overflow weir technology, which is applied in barrage/weirs, water conservancy projects, sea area projects, etc., can solve the problems of slow installation and disassembly, unadjustable overflow weirs, etc., and achieve good orifice shape, fast installation and The effect of disassembly and compactness of the overall structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] The new prefabricated landscape overflow weir includes a fixed frame 1, a stable frame 2, a bearing frame 3, a fixed steel pipe 4, a steel pipe groove 5, a straight lift gate 6 and a straight lift frame 7, the left side of the straight lift frame 7 and the right side of the fixed frame 1 The sides are fixedly connected, the right side of the lift frame 7 is fixedly connected with the left side of the stable frame 2, the upper end of the stable frame 2 is fixedly connected with the lower end of the bearing frame 3, steel pipe grooves are arranged on the left and right sides of the fixed frame 1, the stable frame 2 and the bearing frame 3 4. The fixed steel pipe 4 is movably socketed inside the steel pipe groove 4, and the vertical lift door 6 is movably socketed inside the vertical lift frame 7. The upper end of the stable frame 2 is fixedly connected with the lower end of the bearing frame 3, and the stable frame 2 and the load bearing frame 3 are on the outside. Both si...
Embodiment 2
[0040] Embodiment 2: the difference based on Embodiment 1 is;
[0041] S1, survey the height of the river bottom, and determine the installation position of the fixed steel pipe 4;
[0042] S2, drive the fixed steel pipe 4 into the bottom of the river with a pile driver, and pay attention to controlling the relative size;
[0043] S3, fill up the river bottom in the area 4 of the 4 fixed steel pipes with gravel;
[0044] S4, align the steel pipe groove 5 on the weir body with 4 fixed steel pipes 4, and put it into the river bottom;
[0045] S5, the space between the fixed steel pipe 4 and the steel pipe groove 5 is poured with concrete;
[0046] S6. After the concrete is solidified, drive the steel sheet piles 8 on both sides into the river bottom;
[0047] S7. After fixing the steel sheet piles 8 on both sides, fill the gap with backfill soil and compact it;
[0048] After the weir body of S4 is put into the river bottom, the underwater concrete 18 is filled on the side c...
Embodiment 3
[0050] Embodiment 3: the difference based on embodiment 1 and 2 is;
[0051] The steel sheet pile 8 is composed of a plurality of steel sheet pile assemblies 22, and the steel sheet pile assembly 22 includes a steel sheet pile beam 20, a steel sheet pile left connector 19 and a steel sheet pile right connector 21, and the left end of the steel sheet pile beam 20 is fixed to the right end of the steel sheet pile left connector 19 Connection, the right end of the steel sheet pile beam 20 is fixedly connected to the left end of the steel sheet pile right connector 21, the steel sheet pile left connector 19 matches the steel sheet pile right connector 21, and the steel sheet pile 8 adopts the SP-IV type Larsen steel sheet pile; the fixed frame 1 And stabilizing frame 2 is provided with a plurality of supporting plates 16 and supporting slanting columns 17 on the outer side. 17 The other end is fixedly connected, the fixed frame 1 and the stable frame 2 are provided with a pluralit...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com