Cost prediction method of power transmission and transformation project based on kpca-la-rbm
A technology of engineering cost and forecasting method, applied in forecasting, neural learning methods, instruments, etc., can solve problems such as slow convergence speed of BP neural network algorithm, unsuitable small sample data prediction, easy to fall into local optimal solution, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0100] Below in conjunction with the accompanying drawings, the embodiments of the present invention are further described, in the present invention, KPCA is the kernel principal component analysis, LA is the lion algorithm, and RBM is the restricted Boltzmann machine algorithm;
[0101] like figure 1 As shown, this embodiment is specifically divided into the following steps;
[0102] Step 1. Perform data selection and preprocessing on each sample data, and obtain a set of key influencing factors;
[0103] Collect several sets of sample data to identify the original set of factors affecting the cost of overhead line engineering = {conductor price, wire quantity, line length, area of a single wire, tower material price, tower material quantity, tower base number, basic steel quantity, steel price, The amount of foundation concrete, the amount of earth and stone, the altitude, the terrain distribution, the geological conditions, the construction fee, the construction manageme...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com