A construction method and technology for thin-walled piers, which are applied to bridges, bridge parts, bridge materials, etc., can solve the problems of slow construction speed, long construction period and high construction cost, and achieve the effects of fast construction speed, short construction period and easy formwork removal.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0028] Pier reinforcement installation:
[0029] The root of the main bar of the pier body extends into the platform part. The main bar is threaded at the ground processing site using a pier thick machine to thread the connecting end. The threaded connection end is connected by a sleeve. The pier rebar is installed every 9.0 meters. Temporary internal and external scaffolding is set up at the top of the pier to support the main reinforcement, which facilitates the binding of stirrups and connecting ribs and the installation of other embedded parts;
[0030] The main reinforcement of each section is lifted by a tower crane, and nuts are inserted into the top of the pier column manually and installed in place;
[0031] Turnover mold assembly:
[0032] The formwork is lifted by tower crane equipment and installed manually. The horizontal joints and vertical joints of the inner and outer molds are all made into flat openings, and 3~5mm rubber stop grout is filled during installation to pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com