Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Dynamic compaction digital construction management platform system

A construction management and platform technology

Pending Publication Date: 2019-03-19
NANJING TIANCHENLIDA ELECTRONICS TECH CO LTD
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The traditional construction process requires personnel to monitor and record construction information at the construction site, which is time-consuming and labor-intensive, and there are manual recording errors; the owner, construction unit and supervisor cannot know the construction progress and construction quality at the first time; the owner, construction unit and supervisor generally can only Knowing a construction result data, but not knowing the process information

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic compaction digital construction management platform system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] In the following description, numerous specific details are given in order to provide a more thorough understanding of the present invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced without one or more of these details. In other examples, some technical features known in the art are not described in order to avoid confusion with the present invention.

[0018] In order to thoroughly understand the present invention, detailed steps and detailed structures will be provided in the following description, so as to illustrate the technical solution of the present invention. Preferred embodiments of the present invention are described in detail below, however, the present invention may have other embodiments besides these detailed descriptions.

[0019] refer to figure 1 As shown, the present invention provides a dynamic tamping digital construction management platform system, comprising the following steps:

[002...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a dynamic compaction digital construction management platform system. The dynamic compaction digital construction management platform system comprises the following steps that (1) on-site construction data are received in real time based on a UDP data transmission protocol; step (2), storing construction data information by adopting a MySql database; step (3), adopting a Spring+ SpringMVC + MyBatis technology to build a java platform framework; step (4), customizing a data visualization chart in a personalized manner by adopting an Echarts visualization library; and (5)establishing a digital construction management platform by adopting a Web end website mode, realizing 24-hour all-weather monitoring construction, not requiring on-site recording personnel, avoiding manual errors, ensuring the construction quality and reducing the construction cost.

Description

technical field [0001] The invention relates to the field of dynamic compaction digital construction management, in particular to a dynamic compaction digital construction management platform system. Background technique [0002] The traditional construction process requires personnel to monitor and record construction information at the construction site, which is time-consuming and labor-intensive, and there are manual recording errors; the owner, construction unit and supervisor cannot know the construction progress and construction quality at the first time; the owner, construction unit and supervisor generally can only Knowing a construction result data has no way of knowing the process information. Contents of the invention [0003] In order to solve the above-mentioned shortcomings, the present invention provides a dynamic compaction digital construction management platform system, which realizes 24-hour all-weather monitoring of construction, does not require on-si...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F16/25G06F16/28G06F16/248G06F16/958G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 沈礼伟曹顺朱亚林姜智耀许涛涛
Owner NANJING TIANCHENLIDA ELECTRONICS TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products