A restoration method and quarry technology, applied in the fields of botanical equipment and methods, excavation, container cultivation, etc., can solve the problems of high cost and large amount of foreign soil, and achieve the effects of reducing treatment costs, reducing top-dressing, and reducing costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] A method for repairing the side slope of a gravel pile in a quarry, comprising the following steps:
[0026] (1) Carry out manual / mechanical cleaning of dangerous rocks on the side slope of the rubble pile;
[0027] (2) Calculate the amount of slope cut and calculate the slope coefficient, and calculate the distance between the new slope foot and the original slope foot after slope grading;
[0028] (3) Excavating a 2-3 deep ditch on the soft ground at the foot of the slope, and preparing the planting soil with the excavated soil. The method for preparing the planting soil includes the following steps:
[0029] A. Mix 50% of soil, 10% of cow dung, 20% of sludge and 20% of biogas residue to obtain a mixture;
[0030] B. Add biogas slurry to the mixture in step A, and the amount of biogas slurry to be added per cubic meter of planting soil is 0.2L and stir evenly to obtain stack retting material;
[0031] C. Stack the retting material in step B into a 1m-high stockpile,...
Embodiment 2
[0036] A method for repairing the side slope of a gravel pile in a quarry, comprising the following steps:
[0037] (1) Carry out manual / mechanical cleaning of dangerous rocks on the side slope of the rubble pile;
[0038] (2) Calculate the amount of slope cut and calculate the slope coefficient, and calculate the distance between the new slope foot and the original slope foot after slope grading;
[0039] (3) Excavating a 2-3 deep ditch on the soft ground at the foot of the slope, and preparing the planting soil with the excavated soil. The method for preparing the planting soil includes the following steps:
[0040] A. Mix 45% of soil, 12% of cow dung, 25% of sludge, and 18% of biogas residue to obtain a mixture;
[0041] B. Add biogas slurry to the mixture in step A, and the amount of biogas slurry to be added per cubic meter of planting soil is 0.2L and stir evenly to obtain stack retting material;
[0042] C. Stack the retting material in step B into a 1m-high stockpile...
Embodiment 3
[0047] A method for repairing the side slope of a gravel pile in a quarry, comprising the following steps:
[0048] (1) Carry out manual / mechanical cleaning of dangerous rocks on the side slope of the rubble pile;
[0049] (2) Calculate the amount of slope cut and calculate the slope coefficient, and calculate the distance between the new slope foot and the original slope foot after slope grading;
[0050] (3) Excavating a 2-3 deep ditch on the soft ground at the foot of the slope, and preparing the planting soil with the excavated soil. The method for preparing the planting soil includes the following steps:
[0051] A. Mix 40% of soil, 15% of cow dung, 30% of sludge and 15% of biogas residue to obtain a mixture;
[0052] B. Add biogas slurry to the mixture in step A, and the amount of biogas slurry to be added per cubic meter of planting soil is 0.2L and stir evenly to obtain stack retting material;
[0053] C. Stack the retting material in step B into a 1m-high stockpile,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com