Construction method of built-in double-layer steel bucket drainage system after pouring basement floor
A technology of basement floor and construction method, which is applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of complicated sealing operation of dewatering wells, easy damage of dewatering wells, and small reserved space, and reduce the use of tap water. , good effect, good sealing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] In order to further understand the content of the present invention, the present invention will be described in detail in conjunction with the examples, the following examples are explanations of the present invention and are not limited to the following examples.
[0033] combined with figure 1 and figure 2 As shown, a basement bottom slab post-casting belt built-in double-layer steel drum drainage system in the present invention includes water guide blind ditch 2, advanced water stop belt 3, graded sandstone 5, double-layer steel drum 6, and a ring-shaped Dense steel wire gauze bag 7, graded filter layer 8, gravel layer 9, water-stop steel ring 10, bucket mouth steel plate 11, grouting flower tube 12, suction pipe 13, exhaust pipe 14, post-grouting water-proof layer 16. Post-casting tape 17. The double-layer steel drum 6 is a double-layer steel drum structure composed of an outer layer steel drum 604, an inner layer steel drum 605, and a steel drum bottom plate 602...