Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Personnel material scheduling system based on artificial intelligence technology

A technology of artificial intelligence and dispatching system, which is applied in the field of personnel and material dispatching system, can solve problems such as difficult identification, inflexible functions, falsification of application materials, etc., and achieve the effect of improving construction safety, improving project quality, and preventing difficult tracing

Pending Publication Date: 2019-09-27
STATE GRID TIANJIN ELECTRIC POWER +1
View PDF5 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) Insufficient personnel data statistics, lack of personal occupational credit statistics information, such as major violation records, criminal cases, meritorious service performance and other records are not comprehensive, resulting in the inability to trace personal information;
[0004] (2) The data coverage of the on-site intelligent collection terminal is incomplete. For example, the monitoring of violations cannot be monitored without dead ends for 24 hours; the degree of intelligence is low. If violations are found, the punishment for the violators, construction project managers and other relevant responsible persons is rigid. Poor, discovery of violations, penalties, etc. are opaque;
[0005] (3) The existing platform for material scheduling is redundant, full-featured but not flexible enough, and there is no targeted scheduling software for B’s supply of materials, resulting in the lack of effective tools to verify effective means of verification during the entry review stage; it is difficult to identify fraudulent review materials, It is difficult to trace the responsible person; the collection of application materials and supervision review and verification are time-consuming and inefficient; there is a lack of quality feedback and evaluation mechanisms, and it is impossible to eliminate unqualified suppliers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Personnel material scheduling system based on artificial intelligence technology
  • Personnel material scheduling system based on artificial intelligence technology
  • Personnel material scheduling system based on artificial intelligence technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Embodiments of the present invention are described in further detail below in conjunction with the accompanying drawings:

[0026] A personnel and material scheduling system based on artificial intelligence technology, such as figure 1 As shown, it includes on-site construction personnel information card 1, smart helmet 2, face recognition gate 3, smart monitoring camera 4, hand-held smart terminal 5 and host computer system; the smart monitoring camera is installed at the four corners of the factory On the pole, it is used to monitor the operation of personnel in the factory area in real time and output the collected video information to the upper computer system in real time; the face recognition gate is installed at the entrance of the construction factory area to read the information card of the construction personnel on site and Combined with face recognition, identity verification and admission; the smart helmet is equipped with a GPS positioning module, an image ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a personnel material scheduling system based on an artificial intelligence technology. The personnel material scheduling system is technically characterized by comprising an on-site constructor information card, an intelligent safety helmet, a face recognition gate machine, an intelligent monitoring camera, a handheld intelligent terminal and an upper computer system, the intelligent monitoring camera is used for monitoring personnel operation in a factory area in real time and outputting collected video information to the upper computer system in real time; the face recognition gate is installed at an entrance of a construction plant and used for reading information cards of on-site constructors and authenticating identities in combination with face recognition to be approved and entered. A GPS positioning module, an image acquisition module and a voice alarm module are installed on the intelligent safety helmet and used for outputting position information of on-site constructors to an upper computer system of an on-site work station in real time in a wireless mode. According to the invention, effective management and control on construction site personnel are realized, and digital scheduling is carried out on the B supply material, so that the construction safety and quality of the whole project are improved.

Description

technical field [0001] The invention belongs to the technical field of artificial intelligence and safety dispatching, in particular to a personnel and material dispatching system based on artificial intelligence technology. Background technique [0002] At the current stage, on-site construction workers in industries such as electric power infrastructure and engineering construction have strict normative systems for on-site operation specifications, on-site personnel scheduling, on-site construction scheduling, and supply material scheduling during the construction process. However, due to the large number of construction sites and the limited number of dispatchers, there are still dispatching shortcomings in terms of personnel dispatching and material dispatching, especially for the dispatching of subcontracted team personnel for power infrastructure and the dispatching of supplies. The currently applied platform for dispatching on-site personnel and materials still has th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06K9/00G06K17/00G06Q10/06G06Q10/08
CPCG06K17/0022G06Q10/06312G06Q10/083G06V40/10G07C9/25
Inventor 赵博房向阳赵风松宋佳李昕冯思雨于建国李艳牛嵩迪赵良芳许文彬周骥飞王兴孙伟
Owner STATE GRID TIANJIN ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products