A kind of deep water cofferdam construction method
A construction method and cofferdam technology, applied in infrastructure engineering, construction, etc., can solve the problems of incomplete utilization, difficulty in lengthening the finished rolled threaded steel bars, and increased construction costs, so as to improve the economic benefits of the project and recycle and efficiently use steel , Prevent the effect of unbalanced force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.
[0034] Such as figure 1 , figure 2 and image 3 As shown, a deep-water cofferdam construction method includes the following steps:
[0035] S1: Build the drilling platform 71 on the water surface, insert and drive the steel casing, carry out the construction of the bored pile 3 and the auxiliary pile 4, pour concrete and meet the preliminary consolidation requirements. Specifically, the preliminary consolidation requirement refers to pouring underwater concrete at a certain depth in the bored pile 3 and the auxiliary pile 4, so that the bottom of the bored pile 3 and the auxiliary pile 4 reaches a certain strength, and the steel casing is in a stable state, and will not Shaking because of the waves on the water surface.
[0036] S2: Use bored piles 3 and auxiliary piles 4 as cofferdam positioning piles, connect the steel casings of all co...