Steel truss-concrete composite girder bridge double-layer sma deck pavement system and construction method

A bridge deck pavement and concrete technology, which is applied to bridges, bridge construction, bridge parts, etc., can solve the problems of unreasonable selection of waterproof adhesive layer materials, unreasonable pavement structure design, easy rutting, and shifting, etc., to achieve Improve the accuracy of paving, facilitate the transfer of assembly and disassembly, and facilitate the effect of assembly and disassembly

Inactive Publication Date: 2021-08-13
SICHUAN JIAOTOU CONSTR ENG CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Through the research, it is found that the main reasons affecting the quality of bridge deck pavement are: unreasonable design of pavement layer structure, large particle size of mixture under pavement, prone to rutting, moving and other diseases; unreasonable choice of waterproof adhesive layer material, low shear resistance Insufficient strength, easy to cause diseases such as pavement layer shifting
SMA is an asphalt mixture that meets the requirements of the pavement layer. It has the advantages of excellent thermal stability, anti-skid, wear resistance, crack resistance and water tightness, and low construction requirements. However, how to improve the composite beam bridge The paving accuracy and quality of SMA in China still need to be studied

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel truss-concrete composite girder bridge double-layer sma deck pavement system and construction method
  • Steel truss-concrete composite girder bridge double-layer sma deck pavement system and construction method
  • Steel truss-concrete composite girder bridge double-layer sma deck pavement system and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0036] refer to Figure 1-5 As shown, the double-layer SMA deck pavement system of the steel truss-concrete composite girder bridge mainly consists of a steel truss bridge, a girder bridge pavement, a steel guardrail, a fixed reference suspension system and a contact span floating balance beam system and so on.

[0037] Before construction, check the appearance of the steel bridge deck to ensure that there are no weld bumps, spatters, pinholes, flashes and burrs...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a steel truss-concrete composite girder bridge double-layer SMA bridge deck pavement system, including a steel truss bridge, a girder bridge pavement layer, a steel guardrail, a fixed reference suspension system and a contact spanning floating balance beam system; a steel truss The beam bridge pavement is set on the bridge, and the beam bridge pavement is cement concrete slab layer, waterproof adhesive layer, synchronous crushed stone seal layer and asphalt surface layer from bottom to top. A steel guardrail is installed on the top of the curb band, and a windshield is installed on the base of the guardrail; the asphalt surface layer is composed of an asphalt lower layer and an asphalt upper layer, and is a double-layer SMA bridge deck pavement structure; the cement The concrete slab is a prefabricated assembled structure. The beneficial effects of the present invention are: the synchronous crushed stone seal layer of the present invention adopts a fixed reference suspension system, which has high precision, is convenient to assemble and disassemble, and the components can be reused, effectively ensuring the construction quality of the seal layer.

Description

technical field [0001] The invention relates to a double-layer SMA deck pavement and a construction method of a steel truss-concrete composite girder bridge, which belongs to the field of bridge engineering and is suitable for double-layer SMA pavement construction, especially for the SMA pavement construction of a composite girder bridge. Background technique [0002] In recent years, with the development of my country's national economy, more and more steel beams and steel truss-concrete composite beams have been used in bridge construction. Compared with the steel structure, the steel truss-concrete composite girder bridge uses concrete panels, which reduces the amount of steel used, avoids the fatigue cracking of the steel deck under the action of vehicle loads, and is better than the all-steel girder bridge under live loads. The noise is small, so it is increasingly favored in bridge construction. [0003] The bridge deck pavement is an important part of the bridge str...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E01D19/08E01D21/00
CPCE01D19/083E01D21/00
Inventor 朱绍奇龚霞梁明辉
Owner SICHUAN JIAOTOU CONSTR ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products