A pre-buried grouting unit and soft ground settlement control system and method
A technology for settlement control and weak ground, applied in earthwork drilling, underground chambers, shaft equipment, etc., can solve problems such as uneven stress, weak flexibility, and horizontal unevenness in double-arch tunnels, and achieve multi-directional solutions Uneven settlement, wide application range and strong flexibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036]This embodiment provides a pre-buried grouting unit, which is suitable for the soft ground of a shallow-buried large-section double-arch tunnel, such asfigure 2 As shown, including the initial section, the settlement reading section 14, the slurry diffusion and anchoring section, and the end section, the embedded grouting unit has a hollow grouting cavity 16 inside.
[0037]The initial section is a grouting machine interface 13, the grouting machine interface 13 has an external thread for connecting with the grouting machine, and the grouting machine injects the slurry 19 into the embedded grouting unit through the grouting machine interface 13.
[0038]The settlement reading section 14 is set between the initial section and the first section of slurry diffusion and anchoring section. The settlement reading section 14 is provided with a length scale value, the smallest accurate scale is 1mm; the total length can be determined according to the actual situation, generally Is 500mm. Wh...
Embodiment 2
[0045]This embodiment provides a soft stratum settlement control system, which includes several embedded grouting units 12 described in the first embodiment, a fixed plate 20 connected to the embedded grouting unit 12, and embedded grouting units 12 After being buried in the ground, it is welded with the fixed plate 20 in the primary reinforcement mesh 21.
[0046]Such asfigure 1 withFigure 4 As shown, the embedded grouting unit 12 is arranged in multiple groups along the length of the tunnel, and each group has multiple groups. Several sets of pre-buried grouting units 12 are arranged in a straight line along the tunnel direction, thereby widely covering the overlying stratum area of the tunnel, achieving the purpose of overall stratum reinforcement. In this embodiment, one set of embedded grouting units 12 is set every 10m, and the spacing can be shortened to a set of 5m or less when the formation is poor.
[0047]In this embodiment, six embedded grouting units 12 are embedded at the...