Internet-based power grid construction management and control method and intelligent infrastructure platform system

A technology of the Internet and power grid, applied in the direction of information technology support systems, instruments, data processing applications, etc., can solve problems such as difficult to control risks and manage efficiently and conveniently, and achieve the goal of improving informatization level, improving management level, and reducing work pressure Effect

Pending Publication Date: 2020-08-28
STATE GRID ZHEJIANG ELECTRIC POWER COMPANY TAIZHOU POWER SUPPLY
View PDF4 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, most of the cost management applications of power transmission and transformation projects adopt the manual management mode to manage project information. The personnel of the Ministry of Construction need to complete a large workload for the analysis and statistics of project data. Whether it is work efficiency or project progress, risk control It is difficult to manage efficiently and conveniently

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Internet-based power grid construction management and control method and intelligent infrastructure platform system
  • Internet-based power grid construction management and control method and intelligent infrastructure platform system
  • Internet-based power grid construction management and control method and intelligent infrastructure platform system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] Embodiment 1. An Internet-based power grid construction management and control method, including: assigning user rights and maintaining user information; importing engineering project information, and initializing the planned time for completion of each stage node project according to the planned completion time in the engineering project information; Verify the rationality of the planned time for the completion of each initial node project; according to the rationality verification results, adjust the planned time according to the predetermined specific personnel with user authority to determine the planned completion time of each stage of the project;

[0026] The actual completion time of each stage node of the project is updated by the user with authority, and in response to the update operation, the update review is performed by the predetermined user with authority; the project completion time is matched with the actual completion time to obtain the project The pro...

Embodiment 3

[0031] Embodiment 3. Based on the above embodiments, in this embodiment, the method for verifying the rationality of the planned time for the completion of each node initialization project includes:

[0032] 1) Select the items with the same historical voltage level, calculate the average value of the actual time consumption of each node, and use it as the initial value T of the node time prediction a .

[0033] 2) According to the estimated completion time of initializing each project node, it is counted as T i .

[0034] 3) According to the initial value T predicted by the node time a and initialize the expected completion time of each project node, and determine the time-consuming forecast time T of each node of the follow-up project x , the expression is:

[0035] where n is the number of nodes,

[0036] Determine the data rationality range according to the time-consuming forecast of each node, and determine the completion time of each node according to the range. ...

Embodiment 4

[0053] Embodiment 4. On the basis of Embodiment 3, the system also includes a visual interface module, which is used to perform statistical analysis on the progress status of each project including the completion time of each stage node and the planned time, and the results of the statistical analysis are visualized. Classified display to realize multi-dimensional comprehensive display of project planning time and project completion time.

[0054] On the basis of the centralized processing of engineering project data, visualization technology is used to analyze the differences and comparisons of the same project type from the perspective of management, engineering data structure, and decision-making learning results. Through data mining and calculation learning, a deeper level of statistical display of infrastructure projects. Fully in-depth data mining and analysis to realize project future state time calculation, project progress delay statistics, project start statistics, p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an Internet-based power grid construction management and control method and an intelligent infrastructure platform system. The method comprises the steps of initializing planned time of node engineering completion in each stage according to planned completion time in engineering project information; performing rationality verification on the planned time; adjusting the planning time according to the verification result, and determining the node planning completion time of each stage of the project; and matching the project plan completion time with the actual completiontime to obtain a project progress state. According to the intelligent infrastructure platform system provided by the invention, planning time management, actual completion time management, delay timemanagement and engineering progress information management of each engineering project are carried out; according to the invention, data rationality analysis and adjustment are carried out on the predicted completion time of each node of the project, flow data management and control service and data rationality verification are realized, auxiliary decision information is provided for an engineering project information unified management system, and time nodes of each stage can be accurately controlled.

Description

technical field [0001] The invention belongs to the technical field of power system scheduling automation, and in particular relates to an Internet-based power grid construction management and control method and a smart infrastructure platform system. Background technique [0002] At present, most of the cost management applications of power transmission and transformation projects adopt the manual management mode to manage project information. The personnel of the Ministry of Construction need to complete a large workload for the analysis and statistics of project data. Whether it is work efficiency or project progress, risk control It is difficult to manage efficiently and conveniently. Contents of the invention [0003] The present invention aims at the above technical problems, and provides an Internet-based power grid construction management and control method and a smart infrastructure platform system, which provides auxiliary decision-making basis for ensuring the s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/06
CPCG06Q10/0631G06Q10/103G06Q50/06Y04S10/50
Inventor 巩赞扬李建华朱鹏军周灵刚应斌洪胜杨平许铁龙
Owner STATE GRID ZHEJIANG ELECTRIC POWER COMPANY TAIZHOU POWER SUPPLY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products