Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Economic evaluation simulation comparison method based on tertiary oil recovery projects in different periods

A technology for economic evaluation and project economy, applied in the field of oilfield development, can solve the problems of long cycle, difficult replacement of tertiary oil recovery technology, and insufficient replacement of tertiary oil recovery resources, so as to achieve the effect of enhancing comparability and realizing horizontal and effective comparative evaluation.

Pending Publication Date: 2020-10-13
SENUO TECH CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The tertiary oil recovery project has the characteristics of large investment and long period. At present, the tertiary oil recovery in Shengli Oilfield is facing problems such as insufficient replacement of tertiary oil recovery resources and difficulty in replacing tertiary oil recovery technology. Summarize, compare and evaluate existing tertiary oil recovery projects, and guide the implementation of similar replacement projects
Due to the different tertiary recovery types, reservoir types, and economic evaluation parameters of the tertiary oil recovery projects implemented in different periods, in the post-project evaluation process, the original economic evaluation methods have large gaps in the calculation results, and effective comparative evaluation cannot be achieved. Subsequent projects Implementation lacks guidance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Economic evaluation simulation comparison method based on tertiary oil recovery projects in different periods
  • Economic evaluation simulation comparison method based on tertiary oil recovery projects in different periods
  • Economic evaluation simulation comparison method based on tertiary oil recovery projects in different periods

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The present invention will be further described below through specific embodiments in conjunction with the accompanying drawings.

[0035] The economic evaluation simulation comparison method based on the tertiary oil recovery project in different periods described in this embodiment includes:

[0036] (1) Three-color type classification: According to the three-color chemical formula, the three-color type is classified into polymer flooding, binary compound flooding, and heterogeneous compound flooding.

[0037] (2) Reservoir type classification: Reservoir types are classified according to the material basis before polymer injection, reservoir static parameters, and injection-production intensity, and are divided into types I, II, III, IV, and V.

[0038] Reservoir Type Classification Standard Table for Tertiary Production Project

[0039]

[0040]

[0041] (3) Collect and process annual production data: according to project classification, the production data of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of oil field development, and particularly relates to an economic evaluation simulation comparison method based on tertiary oil recovery projects in different periods. The method comprises the steps of three recovery type classification, oil reservoir type classification, alignment processing of annual production data, simulation of economic evaluationparameters to evaluation time points, economic evaluation of projects of the same type, comparison and analysis of results of the projects of different types according to project classification, determination of influence factors, screening and guidance of replacement projects of the same type and the like. According to the method disclosed by the invention, the three recovery types are classifiedaccording to the three recovery medicament formulas, and the comparability of different three recovery type projects is enhanced; the oil reservoir types are classified according to the influence factors such as the material basis before polymer injection, the oil reservoir static parameters and the injection-production strength, and the comparability of different oil reservoir type projects is enhanced; by aligning production data and simulating economic evaluation parameters, the comparability of the projects in different periods is enhanced; and transverse effective comparison and evaluation of tertiary oil recovery projects in different periods are realized.

Description

technical field [0001] The invention belongs to the technical field of oilfield development, and in particular relates to an economic evaluation simulation comparison method based on tertiary oil recovery projects in different periods. Background technique [0002] Tertiary oil recovery enhanced oil recovery technology, through gas injection, chemical injection, ultrasonic stimulation, microbial injection or heat recovery to achieve enhanced oil recovery in oilfields. Shengli Oilfield carried out tertiary oil recovery laboratory tests in the 1960s, pilot tests in 1992, and industrial promotion in 1997. Through technical exploration, research tests, industrial promotion and new oil displacement system technology breakthroughs, the tertiary oil recovery technology has become the first in the Shengli Oilfield. Leading technology for sustained and stable production in mature oilfields. The tertiary oil recovery project has the characteristics of large investment and long period...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B49/00G06F30/20G06Q50/02
CPCE21B49/00G06Q50/02G06F30/20
Inventor 姚坤乾白哲孙宁松侯照锋吴杰成林苟立平刘爽李德果刘春明伍泰荣谭光明
Owner SENUO TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products