TODO management method and system

A management method and scheduling technology, applied in the computer field, can solve problems such as the influence of subjective factors, and achieve the effect of improving work efficiency, improving human efficiency, and improving capabilities

Pending Publication Date: 2021-02-09
BEIJING MININGLAMP SOFTWARE SYST CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The embodiment of this application provides a TODO management method based on the enterprise WeChat platform to at least solve the problem of subjective factors in related technologies

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • TODO management method and system
  • TODO management method and system
  • TODO management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0054] refer to Figure 1 to Figure 3 As shown, this example discloses a specific implementation of a TODO management method (hereinafter referred to as the "method") based on the enterprise WeChat platform.

[0055] Specifically refer to figure 1 As shown, the method disclosed in this embodiment mainly includes the following steps:

[0056] Step S1, establishing a schedule.

[0057] Specifically, in some of these embodiments, the schedule includes execution time and priority. Priority (priority) is a kind of agreement, the higher priority is done first, and the lower priority is done later. Priority is a parameter that determines the priority level of each operating program to receive system resources when the computer's time-sharing operating system processes multiple operating programs. Before each job is input into the computer, it must be assigned a priority according to certain requirements. For example, according to the nature of the program or its length, or accor...

Embodiment 2

[0077] Combining with the TODO management method based on the enterprise WeChat platform disclosed in the first embodiment, this embodiment discloses a specific implementation example of a TODO management system (hereinafter referred to as "system") based on the enterprise WeChat.

[0078] refer to Figure 4 to Figure 6 As shown, the system includes:

[0079] Planning module 100, to establish schedule planning;

[0080] The reminder module 200 automatically reminds the user according to the schedule.

[0081] Specifically, in some of these embodiments, the planning module 100 specifically includes:

[0082] Time unit 101, counting the schedule to-do items, and setting the execution time of the schedule to-do items;

[0083] The priority unit 102 is configured to set the priority of the to-do items in the schedule.

[0084] Specifically, in some of these embodiments, the reminder module 200 specifically includes:

[0085] The mode unit 201 is configured to set the reminder...

Embodiment 3

[0093] combine Figure 7 As shown, this embodiment discloses a specific implementation manner of a computer device. The computer device may comprise a processor 81 and a memory 82 storing computer program instructions.

[0094] Specifically, the processor 81 may include a central processing unit (CPU), or an Application Specific Integrated Circuit (ASIC for short), or may be configured to implement one or more integrated circuits in the embodiments of the present application.

[0095] Among them, the memory 82 may include mass storage for data or instructions. For example without limitation, the memory 82 may include a hard disk drive (Hard Disk Drive, referred to as HDD), a floppy disk drive, a solid state drive (SolidState Drive, referred to as SSD), flash memory, optical disk, magneto-optical disk, magnetic tape or universal serial bus (Universal Serial Bus, referred to as USB) drive or a combination of two or more of the above. Storage 82 may comprise removable or non-r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a TODO management method and system. The method comprises the steps: establishing a schedule; and automatically reminding a user according to the schedule. Through the method,the user can be automatically reminded based on the schedule established by the user, and the efficiency is effectively improved.

Description

technical field [0001] The present invention relates to the field of computer technology. More specifically, the present invention relates to a TODO management method and system. Background technique [0002] In daily work, there are often a lot of things to deal with, including important, urgent, and trivial things in the work, so we will create memos, to-do agenda items (TODO), and we often use WeChat at work , The application of enterprise WeChat can make work more convenient. Enterprise WeChat is an enterprise communication and office tool created by Tencent's WeChat team. It has the same communication experience as WeChat, rich OA applications, and the ability to connect to the WeChat ecosystem. It can help companies connect internally, connect with ecological partners, and connect with consumers. It has the characteristics of professional collaboration, security management, and people-as-a-service. At present, Enterprise WeChat has covered more than 50 industries su...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10
CPCG06Q10/1093
Inventor 贾金良孔誉乾张毅然
Owner BEIJING MININGLAMP SOFTWARE SYST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products