Project metering system based on WBS

A measurement system and project technology, applied in the field of construction management of engineering projects, can solve problems such as undiscovered decomposition measurement monitoring schemes, and achieve the effect of benefiting quality management and owner's accounting

Inactive Publication Date: 2021-03-12
GUANGXI ROAD & BRIDGE ENG GRP CO LTD
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At present, there is no solution to decompose the WBS of highway construction projects into individual components for measurement and monitoring

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project metering system based on WBS
  • Project metering system based on WBS

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The specific implementation of the invention will be further described below in conjunction with the accompanying drawings.

[0027] like figure 1 As shown, the WBS project measurement system based on this embodiment includes the following contents:

[0028] Model construction unit: used to construct the BIM 3D model of the highway construction project, and analyze and obtain several 3D model components; among them, the model construction unit is specifically, import the structural design software on the BIM, construct the BIM 3D model of the highway construction project, and analyze and obtain Several 3D model components.

[0029] Parameter setting unit: used to set the parameters of each 3D model component, generate a 3D entity and store entity information; the parameter setting unit is specifically, import analysis software to analyze and calculate the 3D model, and form a component flat method information package; embed According to the flat method atlas rules, th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project metering system based on a WBS, and relates to the technical field of engineering project construction management, and the system comprises the following contents: amodel construction unit which is used for constructing a BIM three-dimensional model of a road construction project, and obtaining a plurality of three-dimensional model components through analysis; aparameter setting unit; a standard quantity unit which is used for analyzing and calculating to obtain the standard quantity of the material of each three-dimensional model component; a blanking amount unit which is used for configuring an adjustment value to obtain the blanking amount of the material of each three-dimensional model component; a decomposition unit which is used for carrying out WBS decomposition on the three-dimensional model; a feedback unit which is used for receiving the uploaded construction progress information and the material consumption of each component; and an accounting unit which is used for displaying the progress and material quantity value information of each component. According to the method, the three-dimensional model is constructed based on the BIM, the standard quantity and the blanking quantity are obtained by combining parameter setting, each component project is decomposed and associated by utilizing the WBS, and then the component progress andmaterial quantity value information are displayed according to the uploaded data, so that the metering monitoring of each component project is achieved.

Description

technical field [0001] The invention relates to the technical field of engineering project construction management, in particular to a project measurement system based on WBS. Background technique [0002] BIM (Building Information Modeling, Building Information Modeling) technology was first proposed by Autodesk in 2002 and has been widely recognized by the industry around the world. It can help realize the integration of building information, from building design, construction, operation to building At the end of the whole life cycle, all kinds of information are always integrated in a 3D model information database. The design team, construction unit, facility operation department and owner can work together based on BIM, effectively improving work efficiency, saving resources, reducing costs to achieve sustainable development. [0003] The core of BIM is to establish a virtual three-dimensional model of architectural engineering and use digital technology to provide a co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08G06F30/13
CPCG06Q10/103G06Q50/08G06F30/13
Inventor 陈孝强林广泰李雍友孙辉陈瞬谢灿荣欧晨丰程立飞邹颖智张国龙
Owner GUANGXI ROAD & BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products