Project metering system based on WBS
A measurement system and project technology, applied in the field of construction management of engineering projects, can solve problems such as undiscovered decomposition measurement monitoring schemes, and achieve the effect of benefiting quality management and owner's accounting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The specific implementation of the invention will be further described below in conjunction with the accompanying drawings.
[0027] like figure 1 As shown, the WBS project measurement system based on this embodiment includes the following contents:
[0028] Model construction unit: used to construct the BIM 3D model of the highway construction project, and analyze and obtain several 3D model components; among them, the model construction unit is specifically, import the structural design software on the BIM, construct the BIM 3D model of the highway construction project, and analyze and obtain Several 3D model components.
[0029] Parameter setting unit: used to set the parameters of each 3D model component, generate a 3D entity and store entity information; the parameter setting unit is specifically, import analysis software to analyze and calculate the 3D model, and form a component flat method information package; embed According to the flat method atlas rules, th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com