Embodiment 1
[0043] Such as Figure 1-2 As shown, the present invention provides an assembly-type pipeline module fixing, transporting, and carrying integrated device, which includes a plurality of door-shaped frames 1 arranged side by side. The inner top of the top is connected with a support hanger 3, and its lower part is connected with a moving mechanism 4, and the support hanger 3 is provided with a pipeline group 5.
[0044] The portal frame 1 plays a supporting role. In order to ensure its good strength performance, the portal frame 1 is made of high-strength metal, and an antirust layer is provided on its surface to prolong the service life. In this embodiment, the portal frame 1 can be made by welding three channel steels, which has low cost and high structural strength. Among them, the two-dimensional code 2 is pasted on its outside, which is used to record the information of the integrated device, so as to facilitate follow-up tracking and management.
[0045] The support hang...
Embodiment 2
[0051] Such as image 3 As shown, the present invention also provides a construction method for an integrated device for fixing, transporting and carrying an assembled pipeline module, which includes the following steps:
[0052] S1: Construction of machining center
[0053] According to the production needs of various components, build a processing center around the construction site;
[0054]S2: Modeling of pipeline system
[0055] Obtain the 3D model of the construction site through BIM technology, and use REVIT software to optimize the layout and stress of the pipeline system in the 3D model;
[0056] S3: Splitting of the model
[0057] Split the pipeline system into multiple pipeline groups 5 according to the interval position, construction difficulty, construction schedule and prefabrication processing capacity, and output the prefabrication processing drawings;
[0058] S4: Processing of integrated device
[0059] According to the prefabricated processing drawings ...