Construction method of high-crustal-stress soft rock extrusion large-deformation tunnel
A technology with high ground stress and construction method, applied in tunnels, tunnel linings, earthwork drilling, etc., can solve problems such as endangering people's lives and property safety, easily causing geological disasters, and clearance encroachment.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
[0037] like Figure 1-9 As shown, according to the construction method of the high ground stress soft rock extrusion large deformation tunnel described in the embodiment of the present invention, the main control measures include advanced pre-grouting, large-section excavation, large-diameter locking feet, resin prestressed anchor cables, Double-control ring step, installation arch and mechanized supporting rapid construction technology. The mechanized supporting rapid construction technolog...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com