BIM-based green design quantitative analysis method and system
A quantitative analysis and green technology, applied in the field of data analysis, can solve the problems of inconvenient green quantitative analysis and lack of data support
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as figure 1 As shown, the embodiment of the present application provides a BIM-based quantitative analysis method for green design, the method includes:
[0034] Step S100: Obtain first material information;
[0035] Step S200: According to the first material information, obtain the first material use location information;
[0036] Specifically, the first material information includes various types of materials used in buildings such as paint, wood, and architectural exterior decoration materials, and different material use location information is determined according to different material information. For example, the first material information is building exterior For the paint information of the wall, the first material use position information is the facade of the building. If the first material information is waterproof paint, the first use position information is the ground and the roof. According to different material information to determine different use l...
Embodiment 2
[0110] Based on the same inventive idea as the BIM-based quantitative analysis method for green design in the foregoing embodiments, the present invention also provides a BIM-based green design quantitative analysis system, such as figure 2 As shown, the system includes:
[0111] A first obtaining unit 11, the first obtaining unit 11 is configured to obtain first material information;
[0112] A second obtaining unit 12, the second obtaining unit 12 is configured to obtain first material use location information according to the first material information;
[0113] A third obtaining unit 13, the third obtaining unit 13 is used to obtain the first building BIM model;
[0114] A fourth obtaining unit 14, the fourth obtaining unit 14 is configured to obtain the first used area information according to the first material use location information and the first building BIM model;
[0115] The first execution unit 15, the first execution unit 15 is used to input the first materia...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com