Construction method of pile-supported anchor rod foam concrete embankment structure
A foam concrete and pile-supported technology, applied in infrastructure engineering, underwater structures, roads, etc., can solve problems that affect normal driving, increase the workload of line maintenance and repair, and roadbed diseases, and achieve convenient production and installation. Convenience in construction and improvement of ground bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] The pile-supported anchor foam concrete embankment structure includes an anchor rod 1, a pit 2, double ear reinforcement 3, a water-resistant layer 5, a Z-shaped prefabricated baffle 6, foam concrete 7, a plain concrete covering layer 8, Step-shaped cast-in-place cap 9 and steel pipe pile 10, the steel pipe pile 10 is arranged under the step-shaped cast-in-place cap 9, and the Z-shaped prefabricated baffle 6 is arranged on the step-shaped cast-in-place cap 9, so The pit 2 is set in the steep slope 18, the double ear rib 3 is set in the pit 2, one end of the anchor rod 1 is connected to the Z-shaped prefabricated baffle plate 6, and the other end is vertically set in the steep slope 18 , the foam concrete 7 is arranged between the Z-shaped prefabricated baffle 6 and the steep slope 18, the plain concrete covering layer 8 is arranged above the bottom edge of the Z-shaped prefabricated baffle 6, and the water-resistant layer 5 is arranged on the top The Z-shaped prefabrica...
Embodiment 2
[0037] In the construction method of the pile-supported anchor foam concrete embankment structure, steel pipe piles are laid first, and a step-shaped cast-in-place cap is constructed on the top of the steel pipe piles, then a pit is dug on a steep slope, and double lug joints are buried. Then install the prepared Z-shaped prefabricated baffles and anchors layer by layer, and at the same time backfill foam concrete layer by layer until the design height of the embankment is reached, and finally apply the water-resistant layer and road surface layer to complete the pile-supported anchor foam concrete Construction of embankment structures. Specifically include the following steps:
[0038] 1) if figure 2 , image 3 As shown, according to the needs of engineering construction, the measurement and setting out are carried out. First, two rows of steel pipe piles 10 are set to the design depth, and the top elevation of the steel pipe piles 10 conforms to the shape of the step-shap...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com