Method for treating mud flat or saline-alkali soil by adopting grafted salix psammophila
A technology for saline-alkali land and Salix, which is applied in the field of ecological restoration, can solve the problems of low plants, low plant life rate, and no landscape plant effect, etc. of saline-alkali-tolerant plants, and achieves the effect of ornamental value and high saline-alkali-tolerant activity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Adopt the method of the present invention to carry out grafting cultivation, and its specific method is: use Salix salix as stock; Use yellow willow branch as scion, scion length is 4-5cm, and diameter is 4-5mm; One end of scion is cut into 50-60 degree , as the splicing end; at a distance of 1-1.2m from the ground on the rootstock, cut a grafting groove from top to bottom; then insert the scion onto the rootstock, so that the inclined surface of the splicing end of the scion fits with the grafting groove surface of the rootstock After the scion is grafted onto the rootstock, the grafting interface is wrapped with a plastic bag to expose the scion, and the plastic bag is blocked and cultivated with an adhesive strip.
[0018] After one year of cultivation, the grafted scion branches are grafted to Salix salix with a tree age of 3 years for grafting and cultivation, that is, the tree branches are first grafted to Salix salix for cultivation, and then the grafted tree bran...
Embodiment 2
[0021] The grafted Salix salix cultivated by the method of embodiment 1 is carried out on the tidal flats of the seashore (on the tidal flats of 150 mu of seashores in the Yongfeng Estuary Demonstration Area (demonstration area), when adopting mechanical ditching and ridging in the restoration area, the In the area to be repaired, turn the buttons and plow deeply, and dry it; use a rotary tiller to deep-plow the soil after drying, and level it by rotary tillage.
[0022] After the area to be repaired is leveled, use a ridger to ridge and ditch on the side of the ridge; select a large tractor to plow deeply, and dry it for 1-3 days; use a rotary tiller to deep-dry the soil after drying, and rotate Tilling and leveling 2-4 times; after leveling the area to be repaired, use a ridger to raise the ridge and ditch on the side of the ridge; the time for mechanical ditching and ridge formation is from the end of November to the end of December. The height of the ridge after ridge is 2...
PUM
Property | Measurement | Unit |
---|---|---|
Ridge bottom width | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap