Prefabricated expressway soil slope reinforcing structure and construction method thereof
A technology for highways and soil slopes, applied in infrastructure engineering, botanical equipment and methods, excavation, etc., can solve problems such as reduced construction period, difficult drainage, slope instability, etc., to save construction costs and shorten construction The construction period and the effect of slope reinforcement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] Such as Figure 1~3 As shown, a prefabricated highway soil slope reinforcement structure includes a prefabricated frame 1, a drainage anchor 2 and a composite protective layer 3, the composite protective layer 3 is covered on the slope surface, and the prefabricated frame 1 is press-fitted On the composite protective layer 3. The composite protective layer 3 plays the role of anti-scouring and greening on the slope surface, and the prefabricated frame 1 plays the role of stabilizing and protecting the composite protective layer 3 . The drainage anchor 2 is inserted into the pre-drilled anchor hole in the slope, and the end of the drainage anchor 2 is connected and fixed with the prefabricated frame 1. The drainage anchor 2 plays a drainage role on the one hand, and on the other hand provides a The tensile force makes the prefabricated frame 1 and the composite protective layer 3 more stable.
[0032] Preferably, the material of the prefabricated frame 1 is reinforced ...