Online automatic cleaning device of blast furnace coal injection system and control method of online automatic cleaning device
A blast furnace coal injection and automatic cleaning technology, applied in blast furnaces, blast furnace details, furnaces, etc., can solve problems such as increased main pressure, pipeline blockage, and impact on blast furnace production efficiency, so as to reduce error operations, improve production efficiency, and reduce labor costs. intensity effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0030] Specific embodiment 1 :Such as Figure 5 As shown, a control method for an online automatic cleaning device of a blast furnace coal injection system includes the following steps:
[0031](1) During the blowing process of the main pipe 1, start the inlet valve and outlet valve of the filter 2. When the pressure in front of the filter 2 is too high, the program automatically opens the two sets of second pneumatic valves before and after the spare filter 4. Ball valve 41, after repeating the switch more than 3 times and delaying for 5 seconds, close the two groups of first pneumatic ball valves 21 used to block the filter 2, first open the first slag discharge valve 25 used to block the side of the filter 2, and then open Block the first blowback valve 24 provided on the filter 2, and purge nitrogen for 35 seconds.
[0032] (2) Open the first forward blowing valve 23 provided on the filter 2 to blow for 5 seconds, then close the first forward blowing valve 23 and the fi...
specific Embodiment 2
[0033] Specific embodiment 2 :Such as Figure 5 As shown, a control method for an online automatic cleaning device of a blast furnace coal injection system includes the following steps:
[0034] (1) During the blowing process of the main pipe 1, start the inlet valve and outlet valve of the filter 2. When the pressure in front of the filter 2 is too high, the program automatically opens the two sets of second pneumatic valves before and after the spare filter 4. Ball valve 41, after repeating the switch more than 3 times and delaying for 5 seconds, close the two groups of first pneumatic ball valves 21 used to block the filter 2, first open the first slag discharge valve 25 used to block the side of the filter 2, and then open Block the first blowback valve 24 that is provided with on the filter 2, and purge for 265 seconds. Since the purge gas enters the pulverized coal bunker in a large amount, for preventing the pulverized coal bunker from having an excessively high oxyge...