Fine intelligent management system and method for traffic safety assets
A management system and intelligent technology, applied in the field of project management, can solve problems such as inability to dynamically adjust procurement business, and achieve the effects of project management, cost saving, and material loss reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] The embodiment is basically as attached figure 1 shown, including:
[0038] The plan management module is used to generate the corresponding material demand plan according to the production plan and maintenance plan proposed or approved by the demand department, obtain the corresponding material remaining inventory according to the preset dynamic adjustment time point, and dynamically adjust accordingly according to the material remaining inventory Material demand planning; and according to the preset dynamic adjustment time point, the production behavior data and maintenance behavior data of the preset time period are obtained, and the additional material loss rate is obtained according to the production behavior data and maintenance behavior data, and the material is dynamically adjusted accordingly according to the material additional loss rate Requirements Planning;
[0039] The procurement management module is used for purchasing according to the material demand p...
Embodiment 2
[0053] The only difference from Embodiment 1 is that the plan management module also includes: a defective product adjustment unit, which is used to obtain material process data, perform statistical analysis on the material process data, obtain the material defective rate, and correspondingly calculate the material defective rate according to the material defective rate. Dynamically adjust the material demand plan; the performance adjustment unit is used to obtain the material performance data, obtain the material use coefficient according to the material performance data, and dynamically adjust the material demand plan accordingly according to the material use coefficient.
[0054] In S1, the defective product adjustment unit obtains the material process data, performs statistical analysis on the material process data, obtains the material defective rate, and dynamically adjusts the material demand plan accordingly according to the material defective rate. For example, if the ...
Embodiment 3
[0057] The only difference from Example 1 is that it also includes an environmental adjustment module, which is used to judge the specific type of material through the light transmittance, and judge whether the material will produce non-sustained loss according to the type of material, and if the material will produce non-sustained loss , Adjust the environmental conditions of the workshop to be in the best range. The details are as follows. In this embodiment, the influence of non-production, sudden and unconventional factors on the material loss rate is considered. Usually, the production and maintenance work is carried out in the best environment, for example: the temperature of the workshop is between 20-25°C, and the relative humidity is between 25-35RH. In the best environment, the material loss rate is relatively small. If it is not in the best environment, the material loss rate may be greater. For example, the seamless steel pipe is relatively not so easy to rust in t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com