Ramp and trestle combination for temporary construction transfer platform
A platform-turning and construction technology, applied in bridges, bridge materials, bridge construction, etc., can solve the problems of insufficient support stability of steel trestle, affected by weather factors, inflexible layout, etc. Small, flexible structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] Below by embodiment and in conjunction with accompanying drawing, the present invention is further described:
[0026] combine figure 1 — Image 6 As shown, a temporary construction transfer platform ramp trestle bridge combination is composed of a trestle ramp A and a trestle transfer platform B connected to one end of the trestle ramp A.
[0027] Figure 4 A front view of the trestle ramp A is shown, which is composed of ramp pile supports 1 , ramp steel truss assemblies 2 and ramp deck assemblies 3 arranged from bottom to top.
[0028] The ramp deck assembly 3 is composed of ramp distribution beams 31 and ramp deck steel plates 32 welded and erected on the ramp distribution beams 31 .
[0029] Image 6 A schematic structural diagram of the trestle transfer platform B is shown. The trestle transfer platform B is composed of platform pile supports 5 , platform steel truss assemblies 6 and platform deck assemblies 7 arranged from bottom to top.
[0030] The platfor...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com