Method for preparing solid refuse composite modified asphalt
A composite modified asphalt and solid waste technology, which is applied in the direction of building structure, building components, building insulation materials, etc., can solve the problems affecting the quality of modified asphalt, increasing the cost of raw materials, aging of asphalt, etc., to achieve low price and novel technology , the effect of sufficient sources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0014] Example 1: The process is carried out in two steps. In the first step, heat 16g of surfactant to about 70°C, add 110g of rubber powder in batches under stirring, keep stirring for 8 minutes, and the stirring speed is 40r / min. After stirring evenly, Cool down, discharge, and bag for later use. The second step is to heat 500g of Panjin Huanxiling brand 90# asphalt to 120°C, add 6g of waste plastic fragments in batches under stirring, the stirring speed is 800r / min, continue to heat up to about 170°C, stir rapidly for 6 minutes, and the stirring speed is 1200r / min, the waste plastic has been completely melted into the asphalt. Keep the temperature at about 170°C, add 110g of modified rubber powder in batches under stirring, then stir rapidly for 20 minutes at a stirring speed of 1400r / min, then add 2.5g of crosslinking agent and 6g of waste pyrolytic carbon black, and keep stirring After 6 minutes, high-speed shearing for 30 minutes or colloid mill grinding, heat preserva...
Embodiment 2
[0015] Example 2: The preparation method is the same as in Example 1, except that the base asphalt is Zhonghai 36-1 Binzhou 70# asphalt, and the performance test results are shown in Table 1.
Embodiment 3
[0016] Example 3: The preparation method is the same as in Example 1, except that the base asphalt is Zhonghai 36-1 Binzhou 90# asphalt, and the performance test results are shown in Table 1.
[0017] The basic properties of the prepared solid waste composite modified asphalt are shown in Table 1:
[0018]
project
implement
example 1
implement
Example 2
implement
Example 3
American glue
powder asphalt
standard
Tianjin rubber powder asphalt label
standard (no national standard)
Penetration (25°C,
0.1mm)
50
46
49
25-75
40-60
Softening point (℃)
59
61
59
>54
≥55
Ductility (5℃, cm)
12.5
11.6
12
(4℃)>5
≥10
Segregation (softening spread)
0.7
2.2
1.9
≤2.5
[0019] What is cited in the table is the techni...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com