Repairing method of molten iron chute for mixer furnace

An iron mixing furnace mixing iron slipping and masonry technology, applied in the field of masonry, can solve the problems of increasing masonry time, prone to drilling iron, long masonry time, etc., to shorten the masonry time, reduce splashing, increase The effect of working time

Inactive Publication Date: 2009-03-18
SHANDONG TAISHAN STEEL GROUP
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

From the point of view of the use process of this kind of repairing method, it only takes about 5 days for one use, and the service period is short; the main erosion damage part in the use process is at the notch, because the thermal expansion coefficient of the micro-expansion castable at the notch is different from that of bricklaying , the cracks between the two are pro...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Repairing method of molten iron chute for mixer furnace
  • Repairing method of molten iron chute for mixer furnace

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0037] Refer to attached figure 1 , figure 2 , combined with the actual size of the iron tank in our factory, customize the prefabricated block and make the permanent layer.

[0038] 1. The manufacture of notch prefabricated blocks;

[0039] Prefabricated block 3 section thickness bottom 150-170mm, groove wall 100-150mm, or determined according to the actual size of notch 4; the refractory materials used are mainly iron clad castables and Φ10-16mm rebar, and the distance between rebar is 10-20cm , evenly distributed; the length of the prefabricated block 3 is 10-20cm longer than the length of the notch 4, and the shape of the growing part is eight-shaped, which can be embedded in the groove body, connected with the brickwork, and filled with refractory mud; install the prefabricated block in the notch 4 At 3 o'clock, just spread a layer of refractor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for repairing and bricking an iron charging chute of a blast furnace mixer, which comprises the following steps: 1. a chute mouth precast block is forged; the shape of the precast block is manufactured according to the shapes of a chute mouth and a chute body; 2. the bottom of the chute body is welded with a mushroom nail, is cast with a layer of a casting material as a permanent layer; 3. after finishing casting, the permanent layer and the precast block are kept stand for 12 to 24 hours and are roasted for 24 to 48 hours by small fire; 4. after the permanent layer on the bottom of the chute body is dried, the upper layer is subjected to one-layer bricking; and a brick joint is filled with fire clay; 5. the surface of the chute body towards iron is bricked; 6. the iron charging surface and the residual surface of the iron charging chute are bricked; and 7. impurities on the surface of the iron charging chute are cleaned; and the iron charging chute is kept stand for 12 to 15 hours, is fully solidified, is positioned under a roasting rack and is roasted for 24 to 48 hours and can be brought into production. The method has the advantages of adopting the casting of the permanent layer, increasing and improving the chute mouth precast block, increasing the service life of the iron charging chute, reducing labor intensity, shortening the repairingand bricking time, improving the working efficiency and reducing the cost.

Description

technical field [0001] The invention relates to a repairing method, in particular to a repairing method for a mixing iron chute used for molten iron entering a mixing furnace from a molten iron tank in the iron and steel metallurgy industry. Background technique [0002] The iron mixing chute of the mixing furnace is the only channel responsible for the molten iron entering the mixing furnace from the molten iron tank. The whole mixing tank is composed of the tank body and the notch. The tank body is in a trapezoidal shape, and the iron facing surface is higher than the other two , is the iron ladle tank, and the notch is a ditch where molten iron flows, made of cast iron and lined with refractory materials. [0003] At present, the main building of the trough for adding iron is brickwork. The repairing method is to build three layers of corundum bricks at the bottom of the tank, the first layer is built flat, the second and third layers are vertically built, and the brick ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): C21C1/06
Inventor 吕圣会陈茂宝王华德胥元军亓传军徐光富
Owner SHANDONG TAISHAN STEEL GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products