Rolling earth-rock dam construction method
A construction method and technology for earth-rock dams, applied in dams, barrages, barrages, etc., can solve the problems of increased engineering costs, low utilization rate of working hours, poor economic benefits, etc., and achieve the effect of improving economic benefits.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0008] Embodiments of the present invention: The present invention includes the following contents:
[0009] First, use fresh and hard rocks to transport the newly excavated rocks on site to the dam, and build the dam body;
[0010] Second, to control the porosity of the dam layer, the stone should contain crushed stones and fine materials, and the content of fine materials (about 5mm) should not exceed 30%;
[0011] Third, control the mud content, and the powder less than 0.075mm should not exceed 5%;
[0012] Fourth, control the paving thickness of each layer, using 30t crawler excavators for rolling construction, each layer is 400mm thick, and 40t crawler excavators for rolling construction, each layer is 600mm thick;
[0013] Fifth, each layer is rolled 4 times;
[0014] Sixth, maintain the layer humidity and control the layer water content at 13%-15%. The humidity can be controlled by adding water.
[0015] This technical solution was adopted in the "stacking yard" project of Guizho...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| density | aaaaa | aaaaa |
| density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More