Ecological ditch for sewage treatment, and construction method and use thereof
A technology for ecological ditches and sewage treatment, applied in the direction of biological water/sewage treatment, water/sludge/sewage treatment, sustainable biological treatment, etc., can solve the problem that the biomass has not been improved, and achieve easy implementation, promotion and low cost Low cost, low construction cost and low maintenance cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] In the farmland area of Shuanglongpo Village, Wenchang City, Hainan Province, three rural domestic sewage discharge tributary ditches and the main canals connected to the tributary ditches were selected to carry out the above-mentioned construction method transformation. The height is 35cm, and the length is 70m. Therefore, a total of three foundation weirs were built, the first one was built at a distance of 20m from the water inlet, and then one foundation weir was built every 15m; the ecological interception foundation weir was built by tamping local soil, The bottom width is 15cm, and the top width is 10cm; since these three branch ditches correspond to one household, the height of the base weir calculated from the average daily water volume is very small, so the height is 20cm based on the water outlet of the farmland; the first branch ditches Canna is planted on the side slope, aquatic water spinach is planted at the bottom of the last two branch ditches, and rus...
Embodiment 2
[0041] Two branch ditches and one main canal were selected in the suburban farmland of Kunming City, Yunnan Province for ecological transformation. Among them, the tributary ditch has a trapezoidal cross-section, with a lower width of 15cm, an upper width of 25cm, a height of 20cm, and a length of 30m; the first foundation weir was built at Lijin At the 12m of the water outlet, one will be built every 8m, and a total of three foundation weirs will be built; the ecological interception foundation weir is built with local soil rammed, with a bottom width of 25cm and an upper width of 15cm; The amount of sewage is large, and the average daily water volume of the branch ditches is 10m 3 , after trial calculation, the height of the ecological weir is about 5cm, but the farmland water outlet is about 12cm away from the bottom of the ditch, so the farmland water outlet is used as a reference index to reduce the 2cm, so the weir height is 10cm; the first branch ditch side slope planted...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Bottom width | aaaaa | aaaaa |
| Upper width | aaaaa | aaaaa |
| Height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
